Modec Venture 11 FPSO

Summary Information

Brief Description

  • The FPSO is installed in 156 meters (512 feet) water depth and has an oil processing capacity of 100,000 barrels of oil per day, gas handling of 2-3 million cubic feet per day, produced water treatment of up to 125,000 barrels per day, topsides water injection facilities for 150,000 barrels per day and storage capacity of 930,000 barrels.


  • Modec: Provision of a turret moored floating production, storage and offloading vessel (FPSO)
  • Jurong Shipyard: Vessel conversion
  • Dyna-Mac: Three units of topside modules


  • In operation


  • 2003 - Modec wins FSPO contract
  • 2004 - Naming ceremony for vessel
  • 2005 - Oil production begins

Other Information

  • -


  1. Dyna-Mac Topsides Module Business
  2. Jotun FPSO References
  3. Santos selects MODEC to develop Mutineer-Exeter field, Australia
  4. Milestone for new Australian oil field development
  5. Mutineer-Exeter FPSO Achieve First Oil

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License