Related Pages
Oil Services News
For More Oil Services News
Most Recently Updated Pages
Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
- Kencana HL Sdn Bhd Hook-up Commissioning for Platform Upgrading, Revisit & IO Modification for Samarang Redevelopment Project (Phase 2) September 2012/ 2 months
- South Angsi Oil Field
- Malaysia
- Petronas Carigali Sdn Bhd (PCSB)
- Detailed Design for Angsi Facilities Upgrading Project - Booster Compression Module
- July 2012/ 8 months
- Petronas Carigali Sdn Bhd (PCSB) Design & Engineering Services for SKO Pipelines & Facilities Rejuvenation Project July 2012/ 3 years
- Sarawak Gas Project
- Malaysia
- Murphy
- Front End Engineering & Design for Belum Topside Facility
- July 2012/ 3 months
- Bukit Tua FPSO
- Indonesia
- M3NERGY Offshore Limited
- Process Topsides Front End Engineering Design (FEED)
- July 2012/ 5 months
- Angsi Oil And Gas Field
- Malaysia
- Petronas Carigali Sdn Bhd (PCSB-SBO)
- Front End Engineering Design Services for Angsi CEOR Project
- July 2012/ 4 months
- Petronas Carigali Sdn Bhd (PCSB) Front End Engineering Design Services for Dalak Pipeline Project June 2012/ 5 months
- Sarawak Oil Project
- Malaysia
- Murphy
- Front End Engineering and Design for PERMAS Field Substructure, Topside and Pipeline
- February 2012 / 4-5 months
- Sarawak Shell Berhad Conceptual and Detail Design for Beryl Development on Hip February 2012 / 3 months
- IEV Engineering Sdn Bhd Provision of Detail Design Engineering for D35 Host Tie -In February 2012 / 2 months
- East Belumut Oil Field
- Malaysia
- Newfield
- Provision of Engineering Design for Equipment and System Enhancement for East Belumut - A Platform
- January 2012 / 8 weeks
- Sabah Shell Petroleum Company Limited St. Joseph ASP Pilot Pre-Feed Design CTR # Platform Modification & Well Tie - In for Sabah Shell Petroleum Company Limited October 2011 / 3 months
- Schlumberger MPFM on Samarang - Detail Design for Temporary MPFM & Associate Items (SMJT-F) September 2011 / 1 month
- Talisman Malaysia Limited Work Released for WHRP Tripod Front End Engineering Design (FEED) August 2011 / 2 months
- Petronas Carigali Sdn Bhd (PCSB-SBO)
- Provision of Detailed Design for Pipeline Chemical Injection Facilities
- July 2011 / 3 months
- Petronas Carigali Sdn Bhd (PCSB)
- Provision of Front End Engineering Design Services and Detail Design Services (Optional) for Temana Redevelopment Project
- July 2011 / 14 months
- Angsi Oil And Gas Field
- Malaysia
- Petronas Carigali Sdn Bhd (PCSB)
- Provision of Design and Engineering Services on the Basic Engineering Study for Angsi Chemical Enhanced Oil Recovery (CEOR) Project
- July 2011 / 12 weeks
- Newfield Peninsula Malaysia
- Provision of Topside Detailed Design and Engineering Services for PM323 Tinggi-A To Tiong –A Oil Evacuation Pipeline Project
- June 2011 / 16 weeks
- Petronas Carigali Sdn Bhd (PCSB)
- Provision of Post Feed Design for D21 Development Project.
- June 2011 / 3 months
- Shapadu Energy & Engineering
- Tapis EOR Brownfield Modifications and Retrofits Project
- June 2011 / 12 months
- Kencana HL Sdn Bhd
- South West Ampa Gas Field
- Brunei
- Shell
- Detailed Design for Ampa-9 HP Compressor Module Project - EPC
- May 2011 / 7 months
- Cendor Oil Field
- Malaysia
- PETROFAC
- Provision of Engineering Support Services for Cendor Phase 2 Development Project, Block PM304
- March 2011 / 12 months
Petronas Carigali Sdn Bhd (PCSB)
Provision of Conceptual and Front End Engineering Design Services for Samarang Integrated Operation (IO) Project
February 2011 / 5 months
- Berantai Gas Field
- Malaysia
- Kencana Bestwide Sdn Bhd
- Detailed Design Engineering Work for Wellhead Platform Topside for Berantai Development
- January 2011 / 3 months
Petronas Carigali Sdn Bhd (PCSB-SKO)
Provision of Detailed Design for Installation of Permanent Pump Oil from Oil Tank into Trunkline at SMR-A & Installation of Diesel & Water Bunkering Line at KINDP-A
January 2011
- Sepat Oil Field
- Malaysia
- Kencana HL Sdn Bhd
- Sepat Early Production System Project (MOPU) Structural Layout Study & Other Analysis
- November 2010 / 1 month
- Newfield Peninsula Malaysia
- Provision of Engineering Design Services for Facilities Enhancement & Modification
- November 2010
- Petronas Carigali Sdn Bhd (PCSB-SKO)
- Provision of Piping and Instrumentation Diagrams (P&ID) As Builting and Operating Procedure Manual (OPM) Updating for Bintulu Crude Oil Terminal (BCOT), Temana and Bayan
- September 2010 / 12 months
- Baram Delta Oil And Gas Fields
- Petronas Carigali Sdn Bhd (PCSB-SKO)
- Provision of Piping and Instrument Diagram (P&ID) As Building and Operating Procedure Manual (OPM) Updates for Tukau and Siwa Fields
- September 2010 / 7 months
- Carigali PTTEPI Company Sdn Bhd (CPOC)
- Engineering Services for Front End Engineering Design (FEED) and Follow-On Engineering of Phase-2 Wellhead Platrforms (MDE, MDF and JKB) and Pipelines
- September 2010 / 20 weeks
- Petronas Carigali Sdn Bhd (PCSB)
- Provision of Engineering Revisit for Erb West Development Project
- August 2010 / 5 months
- Petronas Carigali Sdn Bhd (PCSB-SKO)
- Baram Delta Oil And Gas Fields
- Provision of New Pedestal Cranes at Baram and Betty Field
- July 2010 / 12 weeks
- Baram Delta Oil And Gas Fields
- Petronas Carigali Sdn Bhd (PCSB-SKO)
- Provision of Operational HAZOP for Baram And Fairley Baram Field
- May 2010 / One off
- Petronas Carigali Sdn Bhd (PCSB) Provision of Conceptual and FEED For Semarang Redevelopment Phase 2 April 2010 / 8 months
- Petronas Carigali Sdn Bhd (PCSB-SKO) Provision of Engineering For Relocating Gas Detector at D35 For PCSB-SKO August 2009 / 14 Weeks
- East Belumut Oil Field
- Malaysia
- Newfield
- Provision of Engineering Services for Topside Modifications at East Belumut
- March 2009 / 4 months
- Exxon Mobil Exploration & Production FEED Study And Detailed Design For GUE Buttlist Project March 2009 / 6 weeks
- Lawit A Gas Field
- Malaysia
- Exxon Mobil
- Detailed Design For Lawit A Compressor Restage Project
- October 2008 / 6 months
- F28 Gas Field
- Sarawak Shell Bhd (SSB)
- Conceptual Design & Detailed Design For F6 Tie-In for F28 Development Project
- May 2008 / 10 months
- PCPP Operating Co. Sdn Bhd Conceptual, FEED And Detail Design For D1 Cluster Development Project March 2008 / 3 months
- Nippon Oil Exploration Layang Development Project May 2008 / 6 months
- Sarawak Shell Bhd (SSB) Conceptual Design And Detailed Design of St. Joseph Re-Development Project October 2007 / 12 months
- B11 Gas Field
- Petronas Carigali Sdn Bhd (PCSB) / Malaysia Marine & Heavy Engineering
- Engineering, Procurement & Construction (EPC) of PC4 Drilling Platform As Part of PC4 Gas Development Project
- September 2006 / 22 months
- B11 Gas Field
- Petronas Carigali Sdn Bhd (PCSB)
- Front End Engineering Design Services For PC4 Wellhead Drilling Platform Gas Development Project
- October 2006 / 2 months
- Kumang Cluster Gas And Condensate Fields
- Malaysia
- Petronas Carigali
- Provision of Conceptual Design and Engineering Services for Kumang Cluster Development
- July 2006 / 4 months
- Angsi Oil And Gas Field
- Malaysia
- Petronas Carigali Sdn Bhd (PCSB)
- Provision For Engineering Design Services For Angsi IV Development, Procurement, Assistance And Post-AFC Support Services
- July 2006 / 12 months
- D35, D21, J4, PSC Oil And Gas Fields
- Malaysia
- Petronas Carigali Sdn Bhd (PCSB)
- Front End Engineering Design (FEED) J4 & D21 Field Development Project
- April 2006 / 4 months
- Petronas Carigali Vietnam Ltd (PCV) Provision of Conceptual and Basic Engineering Services for Pearl Development Project March 2006 / 6 months
- PM-3 CAA Oil And Gas Fields
- Malaysia
- Talisman
- Provision of Detailed Design of Bunga Kekwa 'C' (BK-C) Annex Topside
- January 2006 / 2 months
- PM-3 CAA Oil And Gas Fields
- Malaysia
- Talisman
- Provision of Detailed Design of Bunga Kekwa 'C' (BK-C) Annex Substructure
- January 2006 / 2 months
- Temana Oil Field
- Malaysia
- Petronas Carigali Sdn Bhd / Vastalux
- Detailed Design For Temana (TEJT-T, TEJT-W & TEJT-C) Platforms Revisit 2
- December 2005 / 4 months
- East Belumut Oil Field
- Malaysia
- Newfield
- Provision for Front End Engineering Design Services For Block PM323 Project (East Belumut & Chermingat Platforms)
- December 2005 / 3 months
- Petronas Carigali Sdn Bhd / Vastalux Detailed Design For ERB West (EWDP-B) Platform Revisit 2 September 2005 / 2 months
- Bumi Bulan And Suriya Gas Fields
- Malaysia / Thailand
- Carigali-Triton Operating Company Sdn Bhd (Hess)
- FEED For Bumi, Bulan & Suriya Gas Field Development
- May 2005 / 6 months
- Sarawak Shell Bhd (SSB) B12 Subsea Wellhead Conceptual and Detailed Design September 2004 / 8 months
- ExxonMobil / Petra Resources Sdn Bhd Procurement & Fabrication Services Associated With GU-E Host Tie-Ins September 2004 / 3months
- Qatar Petroleum / Tenaga Nazar Sdn Bhd
- Engineering Design For EPCC of NF-A (PS-4) Topside Upgrade Detailed Design for Topsides Upgrade of The Following Platforms (Utility Platforms, Riser Treatment Platform, Flare Platform)
- August 2004 / 6 months
- Petronas Carigali Sdn Bhd Conceptual and Detailed Engineering Design Services Interconnecting Pipelines and Tie-Ins to Existing Facilities/Pipeline August 2004 / 6 months