Mazeikiu Nafta Refinery Project
rating: 0+x


Refinery News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Refinery\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

  • Want a weekly review of refining news?

Refining Blog Entries


Summary Information

  • Ownership: PKN Orlen
  • Website:
  • Wiki Page: Mazeikiu Nafta Refinery
  • Location:
  • Capacity: million tons/annum & bbl/day
  • Nelson Complexity:
  • Project Stage:
  • Expected Completion:
  • Budget:

The Project

  • Project Type: Upgrading
  • Project Summary:
    • Revamp of the existing refinery, including a vacuum unit, vacuum gasoil hydrotreater, diesel/kerosene hydrodesulphurization unit, fluid catalytic cracking unit (FCCU), amine and sulfur recovery unit and all related utilities
    • Addition of a Hydrocracker
  • Main Contractors:
    • Foster Wheeler: Basic design, front-end engineering, detailed design and procurement services
  • Licences:
    • Hydrocracker, Chevron Lummus Global

Refining Units

  • New
    • Hydrocracker
  • Revamped
    • vacuum unit,
    • vacuum gasoil hydrotreater,
    • diesel/kerosene hydrodesulphurization unit,
    • fluid catalytic cracking unit (FCCU),
    • amine and sulfur recovery unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -

Products Produced

  • Will increase the ratio of light products

History

  • 2006 - Foster Wheeler Awarded FEED Contract
  • 2008 - Chevron Lummus Global Hydrocracker chosen

Other Information

  • -

Relevant Links


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License