Mazatlan Gas Pipeline

Related Pages

Mexico Gas Pipelines

TransCanada Gas Pipelines

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Pipeline Blog Entries


Summary Information

  • Source: El Oro
  • Destination: Mazatlan, in the state of Sinaloa
  • Ownership: TransCanada
  • Website: http://www.transcanada.com/
  • Length: 413 kilometres (257 miles)
  • Capacity: per day
  • Status: Planned

Details

  • The 24-inch diameter pipeline will be approximately 413 kilometres (257 miles) long and have contracted capacity of 202 million cubic feet a day. The pipeline is expected to be in service in the fourth quarter of 2016. It will interconnect with the El Encino-to-Topolobampo Pipeline (Topolobampo Pipeline)

History

  • 2012 - TransCanada was been awarded the contract to build, own and operate the Pipeline by the ComisiĆ³n Federal de Electricidad (CFE)

Other Information

  • -

Links

  1. TransCanada Wins Additional US$400-Million Contract to Build New Natural Gas Pipeline Infrastructure in Mexico

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License