Marmara LNG Terminal
Summary Information
- Ownership: Botas
- Website: http://www.botas.gov.tr/
- Location: Marmara Ereglisi
- Capacity: million tons/annum
- Status: In Operation
Brief Description
- A medium sized regasification plant
Technical Details
- Storage capacity: 3 tanks of capacity 85,000 m3 each
- Unloading capacity:
- Send out capacity: 685.000 cum/hr
- Constructor:
- CB&I
- Tractebel: Project Management / Engineering Supervision / Construction Management and Supervision / Test, Commissioning and Start-up / Assistance to Operation
- Freyssinet: Pre-stressing for LNG tanks
History
- 1994 - Terminal starts operations
- 1998 - Project launched for 3 vapouriser
Ongoing Projects/Project Status
- -
Suppliers / Customers
- Suppliers: LNG is sourced from Nigeria and Algeria
- Customers: The national grid
Other Information
- -
Relevant Links
- Freyssinet LNG Tank References
- Tractebel Engineering LNG References
- Saipem LNG References
- Botas 2008 Annual Report
- CB&I LNG References
page revision: 13, last edited: 10 Dec 2014 20:48