Marica Gas Field

Related Pages

Croatia Oil & Gas Fields

Eni Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: ENI
  • Country: Croatia
  • Location: Adriatic
  • Production start:
  • Partners: ENI - 50%, INA - 50%
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The field is located in 69 m water depth in the Adriatic Sea

Contractors

  • Tecon: Conceptual, basic and detail structural design of one four legged platform including jacket, deck, well head module
  • Viktor Lenac: Gas production platform
  • Micoperi:
    • Marica ptf. deck, helideck and cold vent installation
    • SSIV and spools installation

History

  • 2002 - ENI signed an agreement for the development of the field
  • 2004 - Platform Installed

Geology

Links

  1. Tecon Platform References
  2. Micoperi Offshore And Platform References
  3. Viktor Lenac Platform References
  4. Eni: Start Up Of The Gas Fields In The Offshore of Croatia With Reserves Of 20 Billion Cubic Meters

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License