Mardi Gras Offshore Oil And Gas Pipeline System

Related Pages

Oil Pipelines in USA

BP Oil Pipelines

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Pipeline Blog Entries


Summary Information

  • Source: Green Canyon and Mississippi Canyon
  • Destination:
  • Ownership: BP
  • Website: http://www.bppipelines.com/
  • Length: kilometres ( miles)
  • Capacity: barrels of oil per day
  • Crude Type:

Brief Description

  • The Mardi Gras Transportation System serves the development of five deepwater fields in the southern Green Canyon and Mississippi Canyon Areas.
  • It has an expected peak flow rate of 1.25 million barrels of oil per day and 1.5 billion standard cubic feet of gas per day by about 2012.
  • This project is made up of pipeline segments extending from deepwater fields (including the Thunder Horse Oil Field located in 6,000 feet of water as well as Na Kika, Mad Dog Oil Field, Holstein Oil Field, and Atlantis Oil Field) to shelf facilities and to shore.
  • It consists of the Proteus and Endymion oil pipeline systems and the Okeanos gas pipeline
  • Proteus is a 28" diameter transportation system which has been designed to transport 420 thousand barrels per day
  • The Okeanos gas pipeline interconnects with the Destin Gas Pipeline at Main Pass 260

Pipeline Status

  • In operation

History

  • 2003 - Open season for Proteus Oil Pipeline

Other Information

  • -

Links

  1. System Map
  2. Proteus Oil Pipeline Company, LLC Announces Open Season

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License