Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
Introduction
- Luoyang Petrochemical Engineering Corporation (LPEC)/SINOPEC is a high-tech company which performs as an EPC contractor and a technology licensor in China energy and petrochemical industries. It is now developing into a globalized prestigious engineering firm which is integrated with project engineering, EPC project contracting, research & development of petroleum refining processes and equipment and license provision.
EPC Projects
- Phase I Project(Package 2) for SINOPEC Luoyang Petrochemical Complex
- LPG fractionation Unit - 300,000 TPY
- HF Alkylation Unit - 100,000 TPY
- LPG Sweetening Unit - 240,000 TPY
- Auxiliary Facilities
- 1986.10-1990.12
- SINOPEC Yangzhou Petrochemial Complex
- Mild Catalytic Cracking Unit
- Associated Systems and Facilities - 40,000 TPY
- 1991.12-1993.03
- Kuwait State Oil Company
- Tank Farm - 5,000 Nm3x4
- 1997.04-1998.08
- SINOPEC Maoming Petrochemical Company
- Residue Oil Hydrodesulfurization Unit - 2.0 MM TPY
- 1997.07-1999.06
- No.3 Refinery of Fushun Petrochemical Company
- Molecular Sieve Dewaxing Unit - 120,000 TPY
- 2000.10-2001.09
- Qingdao Refining & Construction Company
- Catalytic Reforming Unit - 150,000 TPY
- 2002.07-2003.05
- Xi'an Petrochemical Complex
- Catalytic Cracking Unit - 500,000 TPY
- Diesel Hydrotreating Unit - 300,000 TPY
- Hydrogen Generation Unit - 4000Nm3/h
- Associated Systems and Facilities
- 2003.02-2004.5
- Petrochemical Plant of Shengli Oil Field
- Diesel Hydrotreating Unit - 500,000 TPY
- Hydrogenation Revamping Project - 9200 Nm3/h
- 2004.2-2004.09
- Petrochemical Plant of Shengli Oil Field
- Catalytic Reforming Unit - 150,000 TPY
- 2004.02-2004.10
- Xinxing Industrial Company Tarim Petrochemical Branch
- Delayed Coking Unit - 1.2 MM TPY
- Catalytic Reforming Unit - 150,000 TPY
- Gasoline and Diesel Hydrotreating Unit - 1.0 MM TPY
- Hydrogen Generation Unit - 8000 Nm3/h
- Sulfur Recovery Unit - 20,000 TPY
- Auxiliary Facilities
- Zhanjiang Dongxing Petrochemical Company
- Catalytic Cracking Unit Revamping - 500,000 TPY
- CDU Unit Revamping - 5.0 MM TPY
- Catalytic Reforming Unit - 500,000 TPY
- Hydrogen Purification Unit - 40,000 Nm3/h
- Associated Systems and Facilities
- 2003.08-2004.12
- Lanshan National Oil Reserve Base
- 24 Tanks of 10,000 Cubic Meters (Each) 100,000 m3x24
- Associated Systems and Facilities
- 2004.01-2006.08
- Hainan Shihua Refining & Chemical Co.,Ltd
- Diesel Hydrotreating Unit - 2.0 MM TPY
- Jet Fuel Hydrotreating Unit - 300,000 TPY
- Hydrogen Generation Unit - 40,000 Nm3/h
- 2004.10-2006.03
- Guangzhou Petrochemical Company
- Delayed Coking Unit - 1.0 MM TPY
- Catalytic Cracking Unit Revamping - 1.5 MM TPY
- 2005.04-2007.03
- Qingdao Refining & Chemical Co. - Qingdao Refinery
- Continuous Catalytic Reforming Unit - 1.5 MM TPY
- Diesel Hydrotreating Unit - 4.1 MM TPY
- Jet Fuel Hydrotreating Unit - 600,000 TPY
- Sulfur Recovery Unit - 220,000 TPY
- Sour Water Stripper and Solvent Recovery Unit - 230 m3/h
- 2005.04-2008.03
- Dalian West Pacific Petrochemical Co.,Ltd
- Hydrocracking Unit 1.50 MM TPY
- Hydrogen Generation Unit - 720,000 Nm3/h
- 2005.02-2006.10
- SINOPEC - Luoyang Company Refinery
- Delayed Coking Unit - 1.4 MM TPY
- 2006.09-2008.03
- Fujian Integrated Refining & Chemical Project
- Hydrocracking Unit - 2.1 MM TPY
- VGO Hydrotreating Unit - 2.3 MM TPY
- Kerosene Hydrotreating Unit - 1.2 MM TPY
- Diesel Hydrotreating Unit - 2.8 MM TPY
- Solvent Deasphalting Unit - 1.7 MM TPY
- PSA Unit - 8000 NM3/h
- Associated Systems and Facilities for 12 Units
- 2005.08 on stream
- SINOPEC - Luoyang Company Refinery
- Hydrotreating Unit - 2.2 MM TPY
- Hydrogen Generation Unit - 40,000 Nm3/h
- 2006.09 on stream
- CNOOC - Huizhou Refinery
- Medium Pressure Hydrocracking Unit - 3.6 MM TPY
- Gasoline and Diesel Hydrotreating Unit - 2.0 MM TPY
- 2006.11 on stream
- Guangzhou Petrochemical Company
- Catalytic Reforming Complex - 1.0 MM TPY
- 2006.04 on stream
- Dushanzi Petrochemical Company
- Aromatic Extraction Unit - 400,000 TPY
- 2006.10 on stream
- Tianjin Petrochemical Company
- Aromatic Extraction Unit for Catalytic Reformer - 1.0 MM TPY
- Delayed Coking Unit - 2.30 MM TPY
- 2007.11 on stream
- Zhanjiang Dongxing Refining & Associated Facilities
- Residue Catalytic Cracking Unit - 1.2 MM TPY
- FCC Gasoline Hydrotreating Unit - 600,000 TPY
- LPG Fractionation Unit - 300,000 TPY
- Sulfur Recovery Unit - 20,000 TPY
- Product Refining Unit
- Sour Water Stripper
- Solvent Regeneration and Associated Systems for 17 Units
- 2008.03 on stream
- Qingdao Petrochemical Co.,Ltd
- Delayed Coking Unit - 1.6 MM TPY
- Hydrofining Unit - 1.0 MM TPY
- 2008.04 on stream
- Guangxi Petrochemical Company
- Catalytic Cracking Unit - 3.5 MM TPY
- 2008.05 on stream
- West Nate Oil Co.,Ltd
- Condensate oil refinery project in Bangladesh
- 2008.11 on stream
- Tahe Company Refinery
- 3.0 MM TPY Tahe Residue Oil Upgrading Project
- 2# Delayed Coking Unit - 2.2 MM TPY
- 2# Diesel Hydrotreating Unit - 1.40 MM TPY
- 2# Hydrogen Generation - 20,000 Nm3/h
- Sulfur Recovery Unit (including Product Refining, Solvent Regeneration, Sour Water Stripping) - 20,000 TPY
- Associated Systems for 46 units
- 2009.01 on stream