Le Havre Lng Terminal
rating: 0+x

Related Pages

LNG Terminals in France

LNG News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/lng\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More LNG News

LNG Blog Entries

Summary Information

  • Ownership: Gaz de Normandie
  • Website: http://gazdenormandie.com/
  • Location: Le Havre
  • Capacity: 7.0 million tons/annum
  • Status: Planned

Brief Description

  • -

Technical Details

  • Storage capacity: 3 tanks with a total of 170,000 m3
  • Unloading capacity: QatarMax LNG carriers with their 270,000 m3 capacity (130,000 tonnes)
  • Send out capacity:
  • Constructor:
    • Tractabel, Full Owner's Engineer assignment covering: Pre-FEED review and optimisation of regasification system, Assistance to Public Debate, study of various technical solutions (GBS, reclaimed area,…), complete FEED
  • Licensor:

Ongoing Projects/Project Status

  • Capital expenditure currently estimated to be between €700- €800 million
  • Final investment decision expected beginning 2011
  • Terminal commissioning in 2015

Suppliers / Customers

  • Suppliers:
  • Customers: The terminal will feed the gas grid

History

  • 2009 - Application for permission to operate the terminal

Other Information

Relevant Links

  1. Gaz de Normandie has lodged its application for permission to operate the Antifer LNG terminal

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License