KWsubsea Upheaval Buckling And Out Of Straightness Analysis
rating: 0+x

Related Pages

Engineering News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/engineering\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

Engineering Blog Entries


Most Recently Updated Pages



Prelude Floating LNG Terminal

14737949310_3b4bde1eee_m.jpg

Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built


Upheaval Buckling and Out-of-Straightness Analysis

  1. ETKAL-101 and CHE-1 Submarine
    • KW1516
    • Sacmag / Pemex
    • 2012
    • UHB on a hot pipeline, 16" x 8.6km.
  2. Triton Umbilical and Water Inject Project
    • KW1523
    • Subsea7 / Dana Petroleum Ltd
    • 2012
    • OOS analysis of water injection, 10" x 12.7mm x 60 water injection line, approximately 25.4km long. Design temperature is 40°C, pressure 200barg.
  3. Tsimin A to Tsimin B and May A Platforms
    • KW1524
    • SM Proyectos / Permaducto S.A. de C.V.
    • 2012
    • OOS analysis for a 24" x 2.25km and 24" x 8.8km pipeline.
  4. Ku Maloob Zaap Oil Field
    • Pipelines Maloob-A to Maloob-D; Maloob-B to Maloob-D Platforms
    • KW1530
    • SM Proyectos / Global Offshore Mexico
    • 2012
    • OOS analysis for a 24" x 3.3km and 24" x 2.6km pipeline.
  5. Medway Oil And Gas Fields Development
    • KW1540
    • Subsea7 / Dana Petroleum Ltd
    • 2012
    • OOS analysis for 8" x 4.4km and 8" x 8km pipelines.
  6. Ettrick Oil And Gas Field
    • United Kingdom
    • KW1584
    • Nexen
    • 2012
    • OOS analysis for two pipelines both measuring 8" x 1.4km.
  7. Montrose Arbroath Oil And Gas Field
    • United Kingdom
    • KW1592
    • Talisman
    • 2012
    • Shaw and Cayley Development - Predictive UHB of a range of pipes of up to 17km.
    • Design pressures between 296 and 524 bar, with temperatures averaging 100°C.
  8. Incahuasi Gas Field
    • Bolivia
    • KW1603
    • Inelectra (Petrotiger) / Total E&P Bolivie
    • 2012
    • Predictive UHB of 10" flowlines and a 103km gas export pipeline.
  9. Onel-A to Ixtal-A 20
    • KW1612
    • GDT (Cal-Dive) / PEMEX
    • 2012
    • OOS analysis for 20" x 7.8km pipeline.
  10. Boyla Oil Field
    • KW1630
    • Subsea 7
    • 2012
    • Predictive UHB analysis for pipe-in-pipe (21km), water injection (32km), gas line (25km).
  11. Chiswick Gas Field
    • Centrica
    • KEW Flexible
    • KW1654
    • Subsea7 / Centrica
    • 2012
    • OOS analysis 6" flexible pipeline, 3 km long. Design temperature of 40°C with 315 barg design pressure.
  12. Eider Oil Field
    • TAQA
    • Otter
    • KW1658
    • Subsea 7 / TAQA
    • 2012
    • UHB assessment for one 20km production flowline and one 20km water injection flowline.
  13. Athena Oil Field
    • UHB Athena Flowlines
    • KW1661
    • Petrex Ltd / Ithaca
    • 2012
    • OOS analysis of a flexible 2km pipelines (7" and 8"). Design temperature 80°C with 35 barg design pressure.
  14. Enlace Litoral to TMDB
    • KW1573
    • SM Proytectos (CPI) / Pemex
    • 2011
    • UHB for 36" x 77km pipeline.
  15. Devenick Gas Field
    • United Kingdom
    • KW1506
    • BP / Technip
    • 2011
    • 16"/10" PIP (~33.2km) OOS Analysis in addition to 2 offshore 14"/8" PIP with ~1.2km approximate length.
  16. Armada Oil And Gas Field
    • United Kingdom - North Sea
    • KW1453
    • BG
    • 2011
    • Maria Pipeline Assessment - 12" Pipeline approximately 11km long assessed for higher temperature
  17. 24" Homol-A to Chuc-A
    • KW1452 Pemex / Global Offshore Mexico 2011 24" Pipeline approximately 16km long
  18. Kuil Oil And Gas Field
    • Offshore Mexico
    • KW1448
    • Pemex / Global
    • Kuil-A to Homol-A Pipeline
    • 2011
    • 20" Pipeline approximately 3km long
  19. Scott And Telford Oil And Gas Fields
    • Telford WI Replacement Pipeline
    • KW1424
    • Nexen / Subsea7
    • 2011
    • 10" Pipeline approximately 12km long
  20. 20" Hot Pipeline
    • KW1411 IMP 2011 20" Pipeline approximately 8.8km long UHB conceptual design
  21. Ensign Gas Field
    • KW1377
    • Centrica / Subsea7
    • 2011
    • 10" Pipeline with 2" piggyback ~ 22km long with 10" pipeline step-out well ~1.8km long
  22. Scott And Telford Oil And Gas Fields
    • Telford TAB/TAC Development
    • KW1292
    • Nexen / Subsea7
    • 2011
    • 10" Pipeline approximately 4km long
  23. Valhall Oil Field
    • Norway
    • KW1384
    • BP
    • 2010
    • Valhall Flanks Gas Lift Project - 2 offshore pipelines approximately 7.1km and 6km long
  24. Blackbird Oil And Gas Field
    • KW1412
    • Nexen / Subsea7
    • 2010
    • 7" and 3" flexible pipelines (6km)
  25. Deep Panuke Gas Field
    • Canada
    • KW0964
    • Encana / Allseas
    • 2010
    • 22" Gas Export trunkline ~ 70km offshore section
  26. Deep Panuke Gas Field
    • Canada
    • KW1357
    • Encana / Acergy
    • 2010
    • 4 offshore 8" infield lines together (total length ~15km) with 3" Acid Gas Injection Line (1.7km) OOS analysis
  27. Kashagan Oil Field
    • Field Development Phase 1
    • KW1294
    • Agip / KCO
    • 2010
    • OOS Analysis Verification for EP phase for trunklines and infield lines
  28. In Salah Gas Field
    • Algeria
    • KW1361
    • BP / Foster Wheeler
    • 2010
    • UHB study for 16" onshore pipeline
  29. Buchan Oil Field
    • Hannay Field Development
    • KW1426
    • Talisman / Stolt
    • 2010
    • 8" Pipeline 13.1km OOS Verification
  30. Ixtal-B to Ixtal-A
    • KW1372 Pemex / Oceanografia 2010 30" Pipeline 1.8km
  31. Ixtal-A to Abkatun-A
    • KW1156 Pemex / Oceanografia 2010 30" Pipeline 21km
  32. K4B And K5A Gas Fields
    • K5CU Field Development
    • KW1373
    • TOTAL / Subsea7
    • 2010
    • 10"/3" Piggybacked Pipeline (15.2km)
  33. Broom Oil Field
    • United Kingdom - North Sea
    • KW1316
    • Lundin / Technip
    • 2010
    • 16"/10" PIP (7km) OOS Analysis
  34. Burghley Oil Field
    • Development – Hydrotest
    • KW1138
    • Talisman / Technip
    • 2009
    • 10"/4" piggybacked pipeline (10km)
  35. F3 FA Gas Field
    • Development
    • KW1301
    • VPC / Subsea7
    • 2009
    • 10" Gas Pipeline (23km) OOS verification
  36. Seven Seas Gas Field
    • Seven Seas and Grove West Development
    • KW1258
    • Centrica / CSL
    • 2009
    • 6" (1.6km) and 8" (8.2km) UHB study
  37. 12" pipeline between Sinan-F and Tee to 20" Existing pipeline
    • KW1224
    • Pemex / Sacmag
    • 2009
    • 12" (5.5km) UHB Study
  38. Amstel Oil Field
    • Amstel Field Development
    • KW1225
    • Delta Hydro / CSL
    • 2009
    • 8" (24km) UHB Study
  39. Viking Gas Field
    • United Kingdom - North Sea
    • KW1070
    • ConocoPhillips
    • 2009
    • VTS Replacement Project, 16"/3" Piggybacked Pipeline (~27km)
  40. Nini Oil Field
    • Nini East and Siri to Nini Field Development
    • KW1188
    • Dong / Acergy
    • 2009
    • 8" Water Injection (7km) + 4" GL (7km) + 8" Pipeline (9km) + 10" Water Injection (32km)
  41. E18A Gas Fields
    • E18 and P9 Field Development
    • KW1220
    • Wintershall
    • 2009
    • 1 offshore 10" 13%Cr (5.3km) + 1 offshore 8" CS (16.7km)
  42. Xanab Development
    • KW1206 Pemex / Sacmag 2009 1 offshore 20" Pipeline (15km)
  43. Bardolino Oil Field
    • KW1209
    • Shell
    • 2009
    • 1 offshore 6"/3" Piggybacked Pipeline (1.85km)
  44. Topaz Gas Field
    • United Kingdom - North Sea
    • KW1110
    • RWE / Technip
    • 2009
    • 1 offshore 6" Pipeline (15.5km)
  45. Alux Pipeline – SM Proyectosy consultoria
    • KW1133
    • Condux
    • 2009
    • 1 offshore 24" Pipeline (6km)
  46. Replacement Pipeline
    • KW1174
    • Global Offshore
    • 2009
    • 1 offshore 24" Pipeline (6km)
  47. Babbage Gas Field
    • KW1192
    • Dana / EonRuhrgas / CNR / Penspen
    • 2009
    • 12" Gas Pipeline (28km)
  48. Don Area Oil Fields
    • United Kingdom - North Sea
    • KW1009
    • Petrofac
    • 2008
    • West Don Development - 8"/3" Piggybacked (2.3km, 4km) + 8" GE (5km, 10.1km) + 8" Water Injection (2.3km, 5.1km)
  49. Jacky Oil Field
    • KW1123
    • Ithaca
    • 2008
    • 8" Pipeline (4.7km, 5.2km, 0.8km) + 8" Water Injection (4.7km, 5.3km, 0.8km)
  50. Gunnison Oil And Gas Field
    • Durango Field Development
    • KW1054
    • Bridge Resources / ADIL
    • 2008
    • 8" (15km) Pipeline
  51. L09a and L09b Gas Fields
    • L09
    • KW1134
    • Shell
    • 2008
    • 16" (20km) Pipeline
  52. TCO Asset Development
    • KW1020 TCO / Fluor 2008 7 offshore 8" (1.4-4.0km)
  53. Curlew Gas And Condensate Field
    • United Kingdom - North Sea
    • KW0879
    • Shell / Technip
    • 2008
    • Curlew Development - 8"/3" Piggybacked Pipeline (5.7km)
  54. Yme Oil Field
    • Norway
    • KW1053
    • Talisman / Technip
    • 2008
    • 10" Pipeline, 6" Water Injection + 4" Service Line (12km each)
  55. Volund Oil Field
    • Norway
    • KW1022
    • Marathon / Acergy
    • 2008
    • 12" Pipeline + 4" Gas Lift Line (8.9km each)
  56. Rita Gas Field
    • KW1097
    • E.On Ruhrgas / Penspen
    • 2008
    • 8" Pipeline (14km)
  57. Silverstone Development
    • KW1040 Silverstone / ADIL 2008 6" Gas Line (3.7km)
  58. Ettrick Oil And Gas Field
    • KW0916
    • Nexen
    • 2008
    • 10"/4" + 2x8 flexibles (1.4km) + 6" flexible (6.5km) 10"/4" + 2x8" offshore flexible pipelines (1.4km) + 6" flexible pipelines (0.23km and 6km)
  59. Kelvin Gas Field
    • United Kingdom - North Sea
    • KW0920
    • ConocoPhillips
    • 007
    • 12" (12.5km) Pipeline
  60. GKA Development
    • KW0959 VPC / Subsea7 2007 10" (32.3km) Pipeline
  61. Shearwater Gas And Condensate Field
    • United Kingdom - North Sea
    • KW0739
    • Shell / Allseas
    • 2007
    • Starling Field Development - 20"/12" PIP (33km)
  62. Duart Oil Field
    • KW0956
    • Talisman
    • 2007
    • 8"/3" Piggybacked Line (8km)
  63. D15 Gas Fields
    • Minke Field Development
    • UK - North Sea
    • KW0730
    • Gaz de France / Acergy
    • 2007
    • 8" (15.1km) Pipeline
  64. Mimas and Tethys Gas Fields
    • United Kingdom - North Sea
    • KW0904
    • ConocoPhillips
    • 2007
    • 10"/3" Piggybacked Line (3km)
    • 10"/3" Piggybacked Line (14km)
  65. Rev Gas And Condensate Field
    • Norway
    • KW0931
    • Talisman
    • 2007
    • Rev Field Development - 12" (9.2km) Pipeline
  66. Affleck Oil Field
    • KW0926
    • Maersk / Technip
    • 2007
    • 12"/8" PIP (28km)
  67. Montrose Arbroath Oil And Gas Field
    • United Kingdom - North Sea
    • Paladin
    • Wood and Gas Export (WaGE)
    • KW0694
    • Talisman / Technip
    • 2006
    • 6" (11km) + 10"/6" PIP & 2" Piggybacked Pipeline (10.5km)
  68. Tweedsmuir Oil And Gas Field
    • KW0728
    • Talisman / Technip
    • 2006
    • 10"/4" Piggybacked Line(52.8km) 10" pipeline (5.94km)
  69. Enoch Oil Field
    • United Kingdom - North Sea
    • KW0797
    • Talisman / Subsea7
    • 2006
    • 8"/3" Piggybacked Pipeline (15km)
  70. Blane Oil Field
    • United Kingdom - North Sea
    • KW0787
    • Talisman
    • 2006
    • 10" (33km), 8" (33km) Pipelines
  71. Galley Oil Field
    • United Kingdom - North Sea
    • KW0892
    • Talisman
    • 2006
    • Galley Redevelopment - 10" (23.5km) Pipeline
  72. Armada Oil And Gas Field
    • United Kingdom - North Sea
    • KW0838
    • BG/Technip
    • 2006
    • Maria Field Development - 12" (11km) Pipeline
  73. Wenlock Gas Field
    • United Kingdom - North Sea
    • KW0882
    • AT & Bluewater / Pegasus
    • 2006
    • Wenlock and Davy East Development - 6" (5.7km), 8"/3" Piggybacked Pipeline (36km)
  74. Teal And Teal South Oil Fields
    • United Kingdom - North Sea
    • KW0854
    • Shell / Technip
    • 2006
    • 8" (1.34km) Pipeline
  75. Njord Oil And Gas Field
    • Norway
    • KW0657
    • Norsk Hydro / Acergy
    • 2006
    • 12" (40.3km) Pipeline
  76. Alvheim Oil And Gas Field
    • KW0772
    • Marathon / Technip
    • 2006
    • 2 offshore 12" rigid (2.2km), 1 offshore 12" Rigid (4.5km), 1 offshore 10" (5.3km), 1 offshore 14" (36.5km), 1 offshore 14" (3.6km) Pipelines
  77. Arthur III Development Project
    • KW0793 ExxonMobil / Pegasus 2006 8" flexible pipeline (2.7km)
  78. Vilje Oil Field
    • KW0801
    • Norsk Hydro / Technip
    • 2006
    • 1 offshore 12" rigid (19km), 1 offshore 6" rigid (21km) Pipelines
  79. L8 and L5 Offshore Gas Fields
    • WINZ L5C Field Development
    • KW0810
    • Wintershall / Subsea7
    • 2006
    • 1 offshore 10" 13%Cr (8.1km) Pipeline
  80. Merganser Gas And Condensate Field
    • KW0734
    • Shell / Technip
    • 2006
    • 8" (3.8km) Pipeline
  81. Grove Gas Field
    • KW0876
    • Newfield
    • 2006
    • 10" (13.3km) Pipeline

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License