KWsubsea Upheaval Buckling And Out Of Straightness Analysis
Related Pages
Engineering News
Engineering Blog Entries
Most Recently Updated Pages
Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
Upheaval Buckling and Out-of-Straightness Analysis
- ETKAL-101 and CHE-1 Submarine
- KW1516
- Sacmag / Pemex
- 2012
- UHB on a hot pipeline, 16" x 8.6km.
- Triton Umbilical and Water Inject Project
- KW1523
- Subsea7 / Dana Petroleum Ltd
- 2012
- OOS analysis of water injection, 10" x 12.7mm x 60 water injection line, approximately 25.4km long. Design temperature is 40°C, pressure 200barg.
- Tsimin A to Tsimin B and May A Platforms
- KW1524
- SM Proyectos / Permaducto S.A. de C.V.
- 2012
- OOS analysis for a 24" x 2.25km and 24" x 8.8km pipeline.
- Ku Maloob Zaap Oil Field
- Pipelines Maloob-A to Maloob-D; Maloob-B to Maloob-D Platforms
- KW1530
- SM Proyectos / Global Offshore Mexico
- 2012
- OOS analysis for a 24" x 3.3km and 24" x 2.6km pipeline.
- Medway Oil And Gas Fields Development
- KW1540
- Subsea7 / Dana Petroleum Ltd
- 2012
- OOS analysis for 8" x 4.4km and 8" x 8km pipelines.
- Ettrick Oil And Gas Field
- United Kingdom
- KW1584
- Nexen
- 2012
- OOS analysis for two pipelines both measuring 8" x 1.4km.
- Montrose Arbroath Oil And Gas Field
- United Kingdom
- KW1592
- Talisman
- 2012
- Shaw and Cayley Development - Predictive UHB of a range of pipes of up to 17km.
- Design pressures between 296 and 524 bar, with temperatures averaging 100°C.
- Incahuasi Gas Field
- Bolivia
- KW1603
- Inelectra (Petrotiger) / Total E&P Bolivie
- 2012
- Predictive UHB of 10" flowlines and a 103km gas export pipeline.
- Onel-A to Ixtal-A 20
- KW1612
- GDT (Cal-Dive) / PEMEX
- 2012
- OOS analysis for 20" x 7.8km pipeline.
- Boyla Oil Field
- KW1630
- Subsea 7
- 2012
- Predictive UHB analysis for pipe-in-pipe (21km), water injection (32km), gas line (25km).
- Chiswick Gas Field
- Centrica
- KEW Flexible
- KW1654
- Subsea7 / Centrica
- 2012
- OOS analysis 6" flexible pipeline, 3 km long. Design temperature of 40°C with 315 barg design pressure.
- Eider Oil Field
- TAQA
- Otter
- KW1658
- Subsea 7 / TAQA
- 2012
- UHB assessment for one 20km production flowline and one 20km water injection flowline.
- Athena Oil Field
- UHB Athena Flowlines
- KW1661
- Petrex Ltd / Ithaca
- 2012
- OOS analysis of a flexible 2km pipelines (7" and 8"). Design temperature 80°C with 35 barg design pressure.
- Enlace Litoral to TMDB
- KW1573
- SM Proytectos (CPI) / Pemex
- 2011
- UHB for 36" x 77km pipeline.
- Devenick Gas Field
- United Kingdom
- KW1506
- BP / Technip
- 2011
- 16"/10" PIP (~33.2km) OOS Analysis in addition to 2 offshore 14"/8" PIP with ~1.2km approximate length.
- Armada Oil And Gas Field
- United Kingdom - North Sea
- KW1453
- BG
- 2011
- Maria Pipeline Assessment - 12" Pipeline approximately 11km long assessed for higher temperature
- 24" Homol-A to Chuc-A
- KW1452 Pemex / Global Offshore Mexico 2011 24" Pipeline approximately 16km long
- Kuil Oil And Gas Field
- Offshore Mexico
- KW1448
- Pemex / Global
- Kuil-A to Homol-A Pipeline
- 2011
- 20" Pipeline approximately 3km long
- Scott And Telford Oil And Gas Fields
- Telford WI Replacement Pipeline
- KW1424
- Nexen / Subsea7
- 2011
- 10" Pipeline approximately 12km long
- 20" Hot Pipeline
- KW1411 IMP 2011 20" Pipeline approximately 8.8km long UHB conceptual design
- Ensign Gas Field
- KW1377
- Centrica / Subsea7
- 2011
- 10" Pipeline with 2" piggyback ~ 22km long with 10" pipeline step-out well ~1.8km long
- Scott And Telford Oil And Gas Fields
- Telford TAB/TAC Development
- KW1292
- Nexen / Subsea7
- 2011
- 10" Pipeline approximately 4km long
- Valhall Oil Field
- Norway
- KW1384
- BP
- 2010
- Valhall Flanks Gas Lift Project - 2 offshore pipelines approximately 7.1km and 6km long
- Blackbird Oil And Gas Field
- KW1412
- Nexen / Subsea7
- 2010
- 7" and 3" flexible pipelines (6km)
- Deep Panuke Gas Field
- Canada
- KW0964
- Encana / Allseas
- 2010
- 22" Gas Export trunkline ~ 70km offshore section
- Deep Panuke Gas Field
- Canada
- KW1357
- Encana / Acergy
- 2010
- 4 offshore 8" infield lines together (total length ~15km) with 3" Acid Gas Injection Line (1.7km) OOS analysis
- Kashagan Oil Field
- Field Development Phase 1
- KW1294
- Agip / KCO
- 2010
- OOS Analysis Verification for EP phase for trunklines and infield lines
- In Salah Gas Field
- Algeria
- KW1361
- BP / Foster Wheeler
- 2010
- UHB study for 16" onshore pipeline
- Buchan Oil Field
- Hannay Field Development
- KW1426
- Talisman / Stolt
- 2010
- 8" Pipeline 13.1km OOS Verification
- Ixtal-B to Ixtal-A
- KW1372 Pemex / Oceanografia 2010 30" Pipeline 1.8km
- Ixtal-A to Abkatun-A
- KW1156 Pemex / Oceanografia 2010 30" Pipeline 21km
- K4B And K5A Gas Fields
- K5CU Field Development
- KW1373
- TOTAL / Subsea7
- 2010
- 10"/3" Piggybacked Pipeline (15.2km)
- Broom Oil Field
- United Kingdom - North Sea
- KW1316
- Lundin / Technip
- 2010
- 16"/10" PIP (7km) OOS Analysis
- Burghley Oil Field
- Development – Hydrotest
- KW1138
- Talisman / Technip
- 2009
- 10"/4" piggybacked pipeline (10km)
- F3 FA Gas Field
- Development
- KW1301
- VPC / Subsea7
- 2009
- 10" Gas Pipeline (23km) OOS verification
- Seven Seas Gas Field
- Seven Seas and Grove West Development
- KW1258
- Centrica / CSL
- 2009
- 6" (1.6km) and 8" (8.2km) UHB study
- 12" pipeline between Sinan-F and Tee to 20" Existing pipeline
- KW1224
- Pemex / Sacmag
- 2009
- 12" (5.5km) UHB Study
- Amstel Oil Field
- Amstel Field Development
- KW1225
- Delta Hydro / CSL
- 2009
- 8" (24km) UHB Study
- Viking Gas Field
- United Kingdom - North Sea
- KW1070
- ConocoPhillips
- 2009
- VTS Replacement Project, 16"/3" Piggybacked Pipeline (~27km)
- Nini Oil Field
- Nini East and Siri to Nini Field Development
- KW1188
- Dong / Acergy
- 2009
- 8" Water Injection (7km) + 4" GL (7km) + 8" Pipeline (9km) + 10" Water Injection (32km)
- E18A Gas Fields
- E18 and P9 Field Development
- KW1220
- Wintershall
- 2009
- 1 offshore 10" 13%Cr (5.3km) + 1 offshore 8" CS (16.7km)
- Xanab Development
- KW1206 Pemex / Sacmag 2009 1 offshore 20" Pipeline (15km)
- Bardolino Oil Field
- KW1209
- Shell
- 2009
- 1 offshore 6"/3" Piggybacked Pipeline (1.85km)
- Topaz Gas Field
- United Kingdom - North Sea
- KW1110
- RWE / Technip
- 2009
- 1 offshore 6" Pipeline (15.5km)
- Alux Pipeline – SM Proyectosy consultoria
- KW1133
- Condux
- 2009
- 1 offshore 24" Pipeline (6km)
- Replacement Pipeline
- KW1174
- Global Offshore
- 2009
- 1 offshore 24" Pipeline (6km)
- Babbage Gas Field
- KW1192
- Dana / EonRuhrgas / CNR / Penspen
- 2009
- 12" Gas Pipeline (28km)
- Don Area Oil Fields
- United Kingdom - North Sea
- KW1009
- Petrofac
- 2008
- West Don Development - 8"/3" Piggybacked (2.3km, 4km) + 8" GE (5km, 10.1km) + 8" Water Injection (2.3km, 5.1km)
- Jacky Oil Field
- KW1123
- Ithaca
- 2008
- 8" Pipeline (4.7km, 5.2km, 0.8km) + 8" Water Injection (4.7km, 5.3km, 0.8km)
- Gunnison Oil And Gas Field
- Durango Field Development
- KW1054
- Bridge Resources / ADIL
- 2008
- 8" (15km) Pipeline
- L09a and L09b Gas Fields
- L09
- KW1134
- Shell
- 2008
- 16" (20km) Pipeline
- TCO Asset Development
- KW1020 TCO / Fluor 2008 7 offshore 8" (1.4-4.0km)
- Curlew Gas And Condensate Field
- United Kingdom - North Sea
- KW0879
- Shell / Technip
- 2008
- Curlew Development - 8"/3" Piggybacked Pipeline (5.7km)
- Yme Oil Field
- Norway
- KW1053
- Talisman / Technip
- 2008
- 10" Pipeline, 6" Water Injection + 4" Service Line (12km each)
- Volund Oil Field
- Norway
- KW1022
- Marathon / Acergy
- 2008
- 12" Pipeline + 4" Gas Lift Line (8.9km each)
- Rita Gas Field
- KW1097
- E.On Ruhrgas / Penspen
- 2008
- 8" Pipeline (14km)
- Silverstone Development
- KW1040 Silverstone / ADIL 2008 6" Gas Line (3.7km)
- Ettrick Oil And Gas Field
- KW0916
- Nexen
- 2008
- 10"/4" + 2x8 flexibles (1.4km) + 6" flexible (6.5km) 10"/4" + 2x8" offshore flexible pipelines (1.4km) + 6" flexible pipelines (0.23km and 6km)
- Kelvin Gas Field
- United Kingdom - North Sea
- KW0920
- ConocoPhillips
- 007
- 12" (12.5km) Pipeline
- GKA Development
- KW0959 VPC / Subsea7 2007 10" (32.3km) Pipeline
- Shearwater Gas And Condensate Field
- United Kingdom - North Sea
- KW0739
- Shell / Allseas
- 2007
- Starling Field Development - 20"/12" PIP (33km)
- Duart Oil Field
- KW0956
- Talisman
- 2007
- 8"/3" Piggybacked Line (8km)
- D15 Gas Fields
- Minke Field Development
- UK - North Sea
- KW0730
- Gaz de France / Acergy
- 2007
- 8" (15.1km) Pipeline
- Mimas and Tethys Gas Fields
- United Kingdom - North Sea
- KW0904
- ConocoPhillips
- 2007
- 10"/3" Piggybacked Line (3km)
- 10"/3" Piggybacked Line (14km)
- Rev Gas And Condensate Field
- Norway
- KW0931
- Talisman
- 2007
- Rev Field Development - 12" (9.2km) Pipeline
- Affleck Oil Field
- KW0926
- Maersk / Technip
- 2007
- 12"/8" PIP (28km)
- Montrose Arbroath Oil And Gas Field
- United Kingdom - North Sea
- Paladin
- Wood and Gas Export (WaGE)
- KW0694
- Talisman / Technip
- 2006
- 6" (11km) + 10"/6" PIP & 2" Piggybacked Pipeline (10.5km)
- Tweedsmuir Oil And Gas Field
- KW0728
- Talisman / Technip
- 2006
- 10"/4" Piggybacked Line(52.8km) 10" pipeline (5.94km)
- Enoch Oil Field
- United Kingdom - North Sea
- KW0797
- Talisman / Subsea7
- 2006
- 8"/3" Piggybacked Pipeline (15km)
- Blane Oil Field
- United Kingdom - North Sea
- KW0787
- Talisman
- 2006
- 10" (33km), 8" (33km) Pipelines
- Galley Oil Field
- United Kingdom - North Sea
- KW0892
- Talisman
- 2006
- Galley Redevelopment - 10" (23.5km) Pipeline
- Armada Oil And Gas Field
- United Kingdom - North Sea
- KW0838
- BG/Technip
- 2006
- Maria Field Development - 12" (11km) Pipeline
- Wenlock Gas Field
- United Kingdom - North Sea
- KW0882
- AT & Bluewater / Pegasus
- 2006
- Wenlock and Davy East Development - 6" (5.7km), 8"/3" Piggybacked Pipeline (36km)
- Teal And Teal South Oil Fields
- United Kingdom - North Sea
- KW0854
- Shell / Technip
- 2006
- 8" (1.34km) Pipeline
- Njord Oil And Gas Field
- Norway
- KW0657
- Norsk Hydro / Acergy
- 2006
- 12" (40.3km) Pipeline
- Alvheim Oil And Gas Field
- KW0772
- Marathon / Technip
- 2006
- 2 offshore 12" rigid (2.2km), 1 offshore 12" Rigid (4.5km), 1 offshore 10" (5.3km), 1 offshore 14" (36.5km), 1 offshore 14" (3.6km) Pipelines
- Arthur III Development Project
- KW0793 ExxonMobil / Pegasus 2006 8" flexible pipeline (2.7km)
- Vilje Oil Field
- KW0801
- Norsk Hydro / Technip
- 2006
- 1 offshore 12" rigid (19km), 1 offshore 6" rigid (21km) Pipelines
- L8 and L5 Offshore Gas Fields
- WINZ L5C Field Development
- KW0810
- Wintershall / Subsea7
- 2006
- 1 offshore 10" 13%Cr (8.1km) Pipeline
- Merganser Gas And Condensate Field
- KW0734
- Shell / Technip
- 2006
- 8" (3.8km) Pipeline
- Grove Gas Field
- KW0876
- Newfield
- 2006
- 10" (13.3km) Pipeline
page revision: 20, last edited: 17 Jun 2015 11:37