Kharyaga Oil Field
Related Pages
Russia Oil & Gas Fields
Total Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Total
- Country: Russia
- Location: Nenets Autonomous Territory
- Production start:
- Partners: Total - 40%, Statoil (30%), Zarubezhneft (20%) and Nenets Oil Company (10%)
- Type: Oil
- Estimated Reserves:
- Production Volume: 30,000 boe per day
Description
- The Kharyaga oil field lies 60 km north of the Polar Circle, in the Nenets Autonomous Territory
- Kharyaga Development Project Phase III involves progressively increasing the water injection capacity, developing additional reserves, improving plant operability, sustaining an output of 30,000 barrels a day, achieving 95% associated gas utilization and eliminating flaring
Contractors
- SNC-Lavalin: Detailed engineering and procurement for Phase III Package 4
History
- 1999 - Kharyaga production sharing agreement (PSA) signed
- 2007 - The development plan for phase 3 of the Kharyaga field was approved
- 2009 - Zarubezhneft acquires a 20% stake
Geology
Links
- Total transfers a 10% interest in Russia’s Kharyaga field to Zarubezhneft
- SNC-Lavalin Awarded Detailed Engineering And Procurement For Total’s Kharyaga Field In Arctic Russia
- Total and Novatek to join forces for development of Yamal LNG
- Dietsmann awarded Maintenance Engineering and Inspection contract in Kharyaga
page revision: 5, last edited: 06 Mar 2014 14:21