Kepodang Gas Field
Related Pages
Indonesia Oil & Gas Fields
Petronas Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Petronas
- Country: Indonesia
- Location: 2.28 Muriah PSC, Central Java
- Production start: Expected 2015
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- Kepodang Gas Field has an area of 2.779 km2 and is located in East Java Offshore, 180 km northeast of Semarang, Central Java, in water depths of up to 70 meters
- Development consists of a central processing platform, a wellhead platform and a gas export pipeline
Contractors
- PT Bakrie & Brothers: Pipeline construction and operation
- McDermott: Procurement, construction, installation and commissioning of a 5,802-tonne central processing platform; a 1,298-tonne wellhead platform; a 2.7-kilometer-long, 10-inch diameter infield flowline; and installation of remote control facilities at the onshore receiving facilities
- Process Group: 160 MMSCFD TEG Dehydration Package
- FoundOcean: Grouting for WHTC & CPP Jackets
History
- 1999 - Arco acquired a 100% interest in the Muriah block which includes the Kepodang natural gas field
- 2005 - Petronas signs agreement to Supply Natural Gas To Indonesia's PLN
- 2012 - Government Approves Revised Plan of Development
- 2013 - McDermott wins contract for offshore surface facilities and an infield flowline
- 2015 - Topside Float-over Installation completed
Geology
Links
- FoundOcean Subsea References
- Serimax Asia Pipeline References
- Process Group Oil And Gas Processing References
- ARCO Increases its Investment in Indonesian Natural Gas
- Petronas Supplies Natural Gas To Indonesia's PLN
- Government Approves Revised Plan of Development of Kepodang Gas Fields
- McDermott Wins Platforms and Infield Flowline Contract in Indonesia
- Kepodang and Ketapang Field are Ready to Produce by 2014
- McDermott Engineering Solution Drives Successful Topside Float-over Installation
page revision: 14, last edited: 08 Sep 2015 08:16