Kearl Lake Oil Sands Project
Related Pages
Canada Oil & Gas Fields
Exxon Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Imperial Oil
- Country: Canada
- Location: Fort McMurray, Alberta
- Production start: 2013
- Partners:
- Type: Oil - Bitumen
- Estimated Reserves: 4.6 billion barrels
- Production Volume: 220,000 bpd
Description
- The project is a surface mining and bitumen extraction operation located 70 kilometers northeast of Fort McMurray, Alberta
- Oil is upgraded at the Kearl Heavy Oil Upgrader
- The expansion project included three additional trains that use proprietary paraffinic froth treatment technology
- Diluent is supplied by the Polaris Diluent Pipeline System
- Crude is transported on the Woodland Crude Oil Pipeline
Contractors
- Fluor: Engineering, procurement and construction (EPC) contract for infrastructure and offlease facilities for the first phase
- CBI: Procurement, module assembly as well as construction and installation of modular components
- Babcock & Wilcox: Boilers for phases 1&2
History
- 2007 - Approval from Alberta Energy and Utilities Board (AEUB) and the Government of Canada
- 2009 - Fluor awarded EPC contract for infrastructure
- 2012 - CBI awarded contract for modular components
- 2013 - Production starts
- 2015 - Expansion project completed
Geology
Links
- Kearl Overview
- Regulators Approve Imperial Oil’s Kearl Oil Sands Mining Project
- Fluor Secures Kearl Oil Sands Contract in Canada
- CB&I Announces Kearl Oil Sands Expansion Project Contract
- Inter Pipeline Fund: Polaris Pipeline System Enters Commercial Service
- ExxonMobil Announces Production Startup at Kearl Oil Sands Project
- Enbridge to Build $1.3 Billion Woodland Pipeline Extension
- ExxonMobil Announces Kearl Expansion Project Starts Production Ahead of Schedule
page revision: 7, last edited: 05 Oct 2015 11:55