Joslyn Oil Sands Project

Related Pages

Canada Oil & Gas Fields

Total Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Total
  • Country: Canada
  • Location: Fort McMurray, Alberta
  • Production start:
  • Partners: Total - 38.25%, Suncor - 36.75%, Occidental Petroleum - 15% and Inpex - 10%
  • Type: Bitumen
  • Estimated Reserves:
  • Production Volume:

Description

  • The mine is located outside Fort McMurray, Alberta and is designed to produce a projected 100,000 barrels of bitumen per day over the 20-year economic life of the Project.

Contractors

  • Aker Solutions: 1 high temperature, skid mounted Treater Package c/w insulation; desand system & end mounted building - 8 ID x 25

History

  • 2011 - Suncor acquires a 36.75% stake in the project
  • 2012 - The Joint Review Panel approved the project

Geology

Links

  1. Total and Suncor form a strategic alliance in Canada’s oil sands
  2. Total E&P Canada Ltd acknowledges favourable decision regarding its 100,000 barrel-per-day Joslyn North Mine
  3. TOTAL acknowledges receipt of federal Order in Council for Joslyn North Mine Project

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License