Jiangsu LNG Terminal
rating: 0+x

Related Pages

LNG Terminals in China

Petrochina LNG Terminals

LNG News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/lng\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More LNG News

LNG Blog Entries

Summary Information

  • Ownership: Petrochina / CNPC (PetroChina (55%), Jiangsu Guoxin Investment Group Ltd (10%) and Hong Kong-based Pacific Oil & Gas holding (35%))
  • Website: http://www.petrochina.com.cn/
  • Location: Rudong county of Nantong city, China
  • Capacity: 3.5 million tons/annum
  • Status: In Operation

Brief Description

  • A medium sized re-gasification terminal, the LNG project is composed of artificial islands, receiving terminals, pierhead trestles and sea-crossing pipelines, mainly receiving, storing, gasifying and transporting oversea LNG.

Technical Details

  • Storage capacity: 3 * 160,000 cubic-metre
  • Unloading capacity: Maximum unshipping capacity of 267,000 cubic meters
  • Send out capacity: 25 million cubic meters daily
  • Constructor:
    • Huanqiu Contracting & Engineering Corporation (EPC)
    • SOFREGAZ: Services contract for HAZOP and SIL reviews, process and Engineering Documents review & Commissioning procedures preparation and start-up
    • Freyssinet: Pre-stressing for LNG tanks

Ongoing Projects/Project Status

  • The terminal is under start up
  • Construction was Completed in 2011
  • Commercial operations will begin in 2012
  • Phase Two will increase capacity to 6.5 million tons or 8.7 billion cubic meters annually. Completion is expected in 2 years
  • In long-term the project will reach 10 million tons gas 13.5 billion cubic meters annually.

Suppliers / Customers

History

  • 2005 - China National Petroleum signed with the Jiangsu provincial government in Beijing "Jiangsu LNG project cooperation agreement
  • 2006 - Jiangsu LNG project feasibility study report completed.
  • 2008 - SOFREGAZ awarded services contract
  • 2008 - Suplly agreement signed with Qatargas
  • 2009 - Construction launched
  • 2011 - Pre-commissioning work started
  • 2011 - Terminal commissioned with cargo from Qatar

Other Information

  • 8 workers were killed in an accident during construction

Relevant Links

  1. Freyssinet LNG Tank References
  2. Jiangsu liquefied natural gas project (Chinese)
  3. HQCEC Jiangsu LNG Project Starts T-1203 Tank Construction
  4. JIANGSU & DALIAN – CHINA – LNG RECEIVING TERMINALS
  5. PetroChina Jiangsu LNG project becomes trial operational
  6. Qatargas commissions Petrochina's first LNG Terminal
  7. Qatargas delivers first Q-Max LNG Cargo to China

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License