Jasmine Gas And Condensate Field
Related Pages
UK Oil & Gas Fields
Conoco Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: ConocoPhillips
- Country: UK
- Location: blocks P011 and P0032 30/7a, Central North Sea
- Production start: 2013
- Partners: ConocoPhillips - 36.5, BG Group - 30.5%, ENI - 33.0%
- Type: Gas And Condensate
- Estimated Reserves: recoverable reserves are estimated at around 170 mmboe
- Production Volume:
Description
- Jasmine is a high pressure, high temperature (HP/HT) gas-condensate reservoir
- The Jasmine development, located approximately 5.5 miles west of the Judy production facility, comprises a Jasmine wellhead platform (WHP) and an accommodation and utility platform bridge-linked to the WHP; a Judy riser and separation platform (JRP) with additional Judy well slots bridge-linked to the existing Judy platform; and a multiphase pipeline from the WHP to the JRP.
- From Judy, gas is trasported via the CATS Central Area Transmission System Gas Pipeline to the Teesside Gas Processing Plant TGPP
Contractors
- Halliburton: Directional drilling, logging-while-drilling (LWD) and surface data logging (SDL) services
- Dragados Offshore: Constructability analysis, construction engineering, partial purchases, construction, commissioning, load out and sea fastening of two decks
- WorleyParsons: Detailed engineering for three platforms, interconnecting bridges, pipe-in-pipe risers and spools along with the functional design and specification for the subsea pipeline, subsea isolation valves, power/communications cable and umbilicals
- Subsea 7: Engineering, procurement, fabrication, installation and commissioning of two approximately 4km pipeline bundle systems and associated pipe-in-pipe spools
- AMEC: Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities
- Rosetti Marino:
- Procurement, Construction and Commissioning of Topsides for the Jasmine platform
- Construction engineering, procurement, fabrication, load-out and sea-fastening of JASMINE WHP, JLQ & JRP substructures
- IKM Testing: Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging
- Saipem: Wellhead, accomodation and process platforms
- FoundOcean: Grouting for Jasmine Living Quarters & WHP
- KWSubsea: Pipeline Concept Engineering Services
History
- 2006 - Jasmine Gas And Condensate Field discovered
- 2010 - WorleyParsons awarded Detailed engineering contract
- 2010 - Halliburton awarded drilling contract
- 2010 - Dragados Offshore awarded deck contract
- 2013 - First gas produced
Geology
Links
- Central North Sea, ConocoPhillips
- List Of Oil and Gas Production Platforms In The UK
- Saipem Fixed Offshore Production Facilities Project References
- FoundOcean Subsea References
- KWSubsea Subsea References
- Rosetti Marino Platform References
- BG Group announce substantial North Sea discovery
- Subsea 7 Confirms Contract for ConocoPhillips Jasmine Discovery in the North Sea
- IKM Testing Spain awarded a new contract
- Halliburton Wins Contract for Jasmine
- Award by ConocoPhillips for Jasmine Area Development
- AMEC awarded Judy and Jasmine contract North Sea
- Conocophilips Awards A New Contract To Dragados Offshore
- First gas production from UK Jasmine field
page revision: 19, last edited: 31 Aug 2015 06:30