Ichthys FPSO

Related Pages

Australia FPSOs

Inpex FPSOs

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

Brief Description

  • The FPSO is part of the Ichthys LNG Project. The vessel will be used for condensate dewatering, stabilisation, storage and export
  • The vessel will be 336m by 59m and has production capacity of 100,000 barrels of gas condensate per day and 1.2 million barrels storage capacity

Contractors

  • Daewoo Shipbuilding & Marine Engineering (DSME): Construction of FPSO hull
  • Technip: Detailed engineering and procurement assistance for the topsides facilities
  • Alfa Laval: Condensate preheaters
  • Process Group:
    • Fuel Gas H2S and Mercury Removal Package
    • 3 x 672 MMSCFD TEG Dehydration Packages

Status

  • Under construction

History

  • 2012 - Technip awarded topsides contract
  • 2013 - Construction started
  • 2013 - Alfa Laval awarded heater contract
  • 2014 - Keel laying ceremony held
  • 2015 - Topsides integration started

Other Information

  • -

Links

  1. Process Group Oil And Gas Processing References
  2. Technip awarded contract for Ichthys FPSO unit
  3. Construction begins on last major offshore facility (FPSO) for Ichthys
  4. Alfa Laval wins SEK 130 million offshore gas order in South Korea
  5. Ichthys LNG Project Celebrates FPSO Keel Laying
  6. Ichthys topsides integration starts with lifts

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License