Related Pages
- Buy Real and Fake passports in US/WHATSAPP: +1 (725) 867-9567/ Buy replica passports in UK/Buy Citizenship in Dubai/Fake Drivers
- Buy fake USD $ ( WHATSAPP : +1(725) 867-9567 ) , Buy Fake USD currency, where can i buy fake USD, buy counterfeit USD, counterf
- Buy fake canadian dollars in Toronto ( WHATSAPP : +1(725) 867-9567 ) acheter de faux dollars canadiens, Buy Fake Canadian Dollar
- buy us dollars today | buy fake us dollars WHATSAPP: +1 (725) 867-9567 buy usd | Buy fake usd where to buy us dollars where to b
- Buy fake canadian dollars in Toronto ( WHATSAPP : +1(725) 867-9567 ) acheter de faux dollars canadiens, Buy Fake Canadian Dollar
Oil Services News
For More Oil Services News
Introduction
- Since 1991, Offshore & Engineering Division has become a world leading EPIC contractor providing integrated services such as Engineering, Procurement, Construction, Transportation, Installation, Offshore Hook-up and Commissioning, and Project Management.
- Offshore & Engineering Division has successfully completed more than 170 projects including over 100 EPIC projects in turn-key basis and has been recognized as one of the most experienced and advanced offshore yards in the world. The range of products and services covers FPSOs, FLNGs, FPUs, semisubmersibles, jack-ups, TLPs, fixed platforms, subsea pipelines, and land-based LNG and processing modules.
References
FPSO's
- P-33 FPSO
- Conversion Of V.L.C.C. “Henrique Dias”
- Petrobras
- 320m X 54.5m X 27.8m
- EPIC
- Apr. 1996 - Jun. 1998
- Oil Production : 50,000 Bopd, Total : 279,749 M/T, Gas Compression : 2.0 Mmscmd, Class : Abs Class, Storage Capacity : 2.0 Mmbbl, Offloading : 150,000 Bopd
- P-35 FPSO
- Conversion Of V.L.O.O. “Jose Bonifacio”
- Petrobras
- 320m X 54.5m X 28m
- EPIC
- Jun. 1996 - Dec. 1998 Oil Production
- 100,000 bpd, Dead Weight : 270,358 M/T Gas Compression : 3.0 Mmscmd, Class : Abs Class, Storage Capacity : 2.0 Mmbbl, Offloading : 150,000 bpd
- Girassol FPSO
- Total
- 300m X 59.6m X 30.5m
- EPIC
- Jun. 1999 - Feb. 2001
- Oil Production : 200,000 Bopd, Dead Weight : 343,000 Dwt, Water Injection : 250,000 Bwpd, Total : 60,000 M/T Storage Capacity : 2.0 Mmbbl, Accommodation : 140 Men
- Kizomba A FPSO
- Exxon
- 285m X 63m X 32.2m
- EPC
- Jul. 2001 - Jun. 2004
- Oil Production : 250,000 Bopd, Total : 80,661 M/T, Gas Production : 400 Mmcfd, Storage Capacity : 2.2 Mmbbl, Accommodation : 100 Men
- Kizomba B FPSO
- Exxon
- 285m X 63m X 32.2m
- EPC
- Dec. 2002 - Oct. 2005
- Oil Production : 250,000 Bopd, Total : 80,661 M/T, Gas Production : 400 Mmcfd, Storage Capacity : 2.2 Mmbbl, Accommodation : 100 Men
- Greater Plutonio FPSO
- BP
- 310m X 58m X 32m
- EPC
- Jan. 2004 - Apr. 2007
- Oil Production : 250,000 Bopd, Total : 72,700 M/T, Topsides : Ic Gas Production : 8 Mmscmd, Storage Capacity : 2.0 Mmbbl, Accommodation : 120 Men
- AKPO FPSO
- Total
- 310m X 61m X 31m
- May 2005 - Nov. 2008
- L/Q Spread Moored, Total : 98,450 M/T
Others
- Amenam/Kpono FSO
- Total
- 298m X 62m X 32m
- EPC
- Sep. 2000 - Dec. 2002
- Storage Capacity : 2.4 Mmbbl, Total : 43,500 M/T (T & I : Sbm) Displacement : Max. 340,000dwt, Design Life : 25 Years
- Na Kika Semi-Submersible FPU
- Shel
- 31,609 M/T
- PCT
- Feb 2001 - Jan. 2003 Oil Production, Gas Production : 325 Mmcfd
- West Seno FP
- Unocal
- 152m X 38m X 10m
- EPIC
- Aug. 2001 - Jul. 2003
- Tlp : 50m X 50m X 40m Pipeline (2 Lines) : 12” X 62 Km, Total : 28,350 M/T
- Moho Bilondo FPU
- Total
- 188.5m X 34m X 12.5m
- Epic
- Jun. 2005 - Feb. 2008
- Troll-C FPU
- Hull Construction
- Norsk Hydro
- 14,100 M/T
- EPCT
- Apr. 1997 - Nov. 1998
- (Gva 8000) - Contractor : Umoe Haugesung