Hasdrubal Gas Field

Related Pages

Tunisia Oil & Gas Fields

BG Group Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: BG Group
  • Country: Tunisia
  • Location: Offshore, Gulf of Gabes
  • Production start: 2009
  • Partners:
    • BG Group 50%,
    • Entreprise Tunisienne d’Activités Pétrolières (ETAP) 50%
  • Type: Gas & condensate
  • Estimated Reserves:
  • Production Volume:

Description

  • The Hasdrubal onshore gas processing facility (BG Group 50%, ETAP 50%) and LPG production facility (100% BG Group) have been built adjacent to the Hannibal plant. Gas is sold to STEG while liquids and LPG are exported or sold in the local market.
  • Hasdrubal A platform consists of a 1,000 ton jacket and a 1,500 ton topside

Contractors

  • Petrofac: Front-end engineering and design (FEED) for the development of the Hasdrubal field
  • Heerema: Engineering, procurement, construction, transportation and installation (EPCI) of the Hasdrubal A platform
  • Saipem: Offshore Pipeline installation
  • Cladtek: CRA Flowlines
  • FoundOcean: Hasdrubal A grouting

History

  • 1975 - The Hasdrubal field was first discovered by Elf
  • 1998 - Successful appraisal wells drilled
  • 2002 - BG finds light oil in the Hasdrubal South West extension
  • 2005 - Petrofac Awarded Hasdrubal Development FEED
  • 2007 - Heerema awarded the engineering, procurement, construction, transportation and installation (EPCI) of the Hasdrubal A platform
  • 2009 - Production began

Geology

Links

  1. BG Group Tunisia
  2. FoundOcean Subsea References
  3. Saipem Africa Pipeline References
  4. Oil And Gas Concessions In Tunisia
  5. Petrofac Awarded Hasdrubal Development FEED
  6. BG Tunisia completes successful Hasdrubal SW-1 well
  7. Success For Tunisian Appraisal Well
  8. Construction Hasdrubal platform well under way
  9. Cladtek completes delivery of British Gas Hasdrubal CRA Flowlines

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License