Haoudh El Hamra Arzew Oil Pipeline
Summary Information
- Source: Haoudh El Hamra
- Destination: Arzew
- Ownership:
- Website:
- Length: 403 kilometres ( miles)
- Capacity: barrels of oil per day
- Crude Type:
Brief Description
- The pipeline, running 403 kilometers with diameter of 34 inches, has capacity to transmit 34 million tons of oil per year
- The oil pipeline passed through rocky, extremely rugged topography with a high degree of erosion; it intersected twelve rivers, mountain ranges, automobile roads and railroads
- There are six pumping stations and the terminal
Pipeline Status
- In operation
History
- 2000 - Stroytransgaz won a tender to construct the pipeline
Other Information
- -
Links
- New Saipem Onshore Construction Acquisition in Algeria
- OZ-2 (Haoud El Hamra-Arzew) oil pipeline, Stroytransgaz
page revision: 4, last edited: 02 Jan 2014 11:45