Haltenpipe Gas Pipeline

Related Pages

European Gas Pipelines

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Pipeline Blog Entries


Summary Information

  • Source: Heidrun Oil Field
  • Destination: Tjeldbergodden
  • Ownership: Gassco
  • Website: http://www.gassco.no/
  • Length: 250 kilometres ( miles)
  • Capacity: 7 MSm3 per day
  • Status: Operating

Details

  • The Haltenpipe line is 250 kilometres long and carries gas from the Heidrun Oil Field in the Norwegian Sea to Tjeldbergodden in mid-Norway.

Contractors

  • Saipem: Transportation and Installation
  • Global Maritime: Safety assessment of marine operations and marine risks

History

  • 1995 - The Haltenpipe joint venture was established
  • 1996 - Pipeline started operations

Other Information

  • -

Links

  1. Haltenpipe
  2. Global Maritime Pipeline References
  3. Saipem Europe Pipeline References

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License