Gulf Pascagoula Lng Terminal
rating: 0+x

Related Pages

LNG Terminals in USA

El-Paso LNG Terminals

LNG News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/lng\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More LNG News

LNG Blog Entries

Summary Information

Brief Description

  • A regasification terminal

Technical Details

  • Storage capacity: 2 * 160,000 cubic metres
  • Unloading capacity: The project includes a new marine dock capable of handling 250,000 m3 LNG tankers
  • Send out capacity: 1.3 BSCFD
  • Constructor:
    • Technip: Front end engineering (FEED) of the terminal
  • Licensor:

Ongoing Projects/Project Status

  • Under construction
  • Completion is expected at the end of 2011

Suppliers / Customers

  • Suppliers: Sonagol will supply some of the LNG
  • Customers: Initially, the facility will have pipeline interconnects with Gulfstream and Destin pipelines, a joint venture pipeline between Florida Gas Transmission and Transco, as well as a BP gas processing facility, to be located about 5 miles from the terminal.

History

  • 2005 - Technip awarded feed contract
  • 2010 - GE Energy Financial Services acquired 50% of the project
  • 2011 - Terminal operations began

Other Information

  • -

Relevant Links


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License