Grissik Batam Singapore Gas Pipeline
Summary Information
- Source: Indonesia
- Destination: Singapore
- Ownership: Transgasindo TGI
- Website: http://www.tgi.co.id/
- Length: 470-km kilometres ( miles)
- Capacity: 650 mmscf/day
- Status: Operating
Details
- The 470-km pipeline, designed for a throughput capacity of 650 mmscf/day, brings natural gas from Indonesia’s Sumatra Island to Singapore
History
- 2003 - Pipeline operations started
Other Information
- -
Links
page revision: 5, last edited: 29 Jul 2015 13:04