Golden Pass Lng Export Terminal Project
Summary Information
- Ownership: Golden Pass LNG
- Qatar Petroleum International, (70%),
- ExxonMobil (30%)
- Website: http://www.goldenpasslng.com
- Location: Port Arthur, Texas, USA
- Capacity: million tons/annum
- Status: Planned
Brief Description
- The proposed project would have the capacity to send out approximately 15.6 million tons of LNG per year. It involves construction of additional facilities to the existing Golden Pass Lng Terminal
- New infrastructure required to export will be located on the existing property, which currently contains two berths for LNG tankers, five storage tanks and access to the Golden Pass pipeline.
- The expanded facility would then have the capability and flexibility to both import and export natural gas.
Technical Details
- Storage capacity:
- Constructor:
- CB&I / Chiyoda: Front end engineering design (FEED) services contract
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 201X
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2012 - Golden Pass applies to the DOE to be able to export natural gas to nations that have existing free trade agreements (FTA) with the United States
- 2014 - CB&I / Chiyoda awarded FEED
Other Information
- -
Relevant Links
- Golden Pass Files Application with Department of Energy to Export LNG
- CB&I Announces Contract for LNG Export Facility
page revision: 5, last edited: 10 Aug 2014 08:57