Gioia Tauro Medgas LNG Terminal
rating: 0+x

Related Pages

LNG Terminals in Italy

LNG News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/lng\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More LNG News

LNG Blog Entries

Summary Information

Technical Details

  • Storage capacity: 3-4 full containment tanks of 160,000 m3 each
  • Unloading capacity:
  • Send out capacity: 12 Bcm/y
  • Capacity range of LNG carriers: 90,000 up to 270,000 m3
  • Constructor:
    • Tractabel: Pre-FEED phase with conceptual design and cost estimate at ± 25 %. Front End Engineering and Design (FEED) with cost estimate at ± 10 %. Specification of EPC scope and procedures and ITT package. The assignment covers the whole terminal except pipe-in-pipe cryogenic lines.
  • Licensor:

History

  • 2008 - Environmental Impact Assessment Report submitted

Ongoing Projects/Project Status

  • Construction has not yet started

Suppliers / Customers

  • Suppliers: Currently the terminal does not have a supplier
  • Customers: The partners are large players in the Italian gas market and have existing customer portfolios to sell to

Other Information

  • The project is eligible for EU funding

Relevant Links

  1. Tractebel Engineering LNG References
  2. IRIDE - SORGENIA PARTNERSHIP FOR REGASSING UNIT IN GIOIA TAURO
  3. Sorgenia Strategy Presentation
  4. Iride, Sorgenia win EU funding for Gioia Tauro LNG terminal