Gasene Gas Pipeline
Summary Information
- Source: Cacimbas, Brazil
- Destination: Catu, Brazil
- Ownership: Petrobras
- Website: http://www.petrobras.com.br/
- Length: 1,375 kilometres ( miles)
- Capacity: per day
- Status (Operating/Planned/Under Construction)
Details
- There are three sections to the pipeline
- Section 1: Cacimbas-Vitória (129km)
- Section 2: Cabiúnas-Vitória (300km)
- Section 3: Cacimbas (ES)-Catu (BA) (946km)
History
- 2007 - Section 1 began commercial operations
- 2007 - Petrobras begins construction of the third section
Other Information
- -
Links
page revision: 3, last edited: 09 Jul 2012 12:52