Gasene Gas Pipeline

Related Pages

Pipeline News


For More Pipeline News

Pipeline Blog Entries


Summary Information

  • Source: Cacimbas, Brazil
  • Destination: Catu, Brazil
  • Ownership: Petrobras
  • Website: http://www.petrobras.com.br/
  • Length: 1,375 kilometres ( miles)
  • Capacity: per day
  • Status (Operating/Planned/Under Construction)

Details

  • There are three sections to the pipeline
    • Section 1: Cacimbas-Vitória (129km)
    • Section 2: Cabiúnas-Vitória (300km)
    • Section 3: Cacimbas (ES)-Catu (BA) (946km)

History

  • 2007 - Section 1 began commercial operations
  • 2007 - Petrobras begins construction of the third section

Other Information

  • -

Links


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License