Garrow And Kilmar Gas Fields

Related Pages

UK Oil & Gas Fields

Petroleum Equity Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Petroleum Equity
  • Country: UK
  • Location: Southern North Sea
  • Production start: 2007
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The fields are alao known as the Tors Field
  • Kilmar which is comprised of two separate gas accumulations, is east of Garrow in 185' of water
  • Development plans for Kilmar include a production platform and a 22 km pipeline laid to an offset host platform.
  • Garrow, in 170' of water, was developed also with a production platform and a 23 km pipeline over to the ATP Kilmar platform

Contractors

  • Bluewater: Construction of Garrow & Kilmar Platforms
  • Seaway Heavy Lifting: Installation of Garrow & Kilmar Platforms
  • Stolt Offshore: Subsea Installation

History

  • 2005 - Development approval granted
  • 2005 - ATP acquired GDF Suez stake, becoming 100% owner
  • 2007 - Production started
  • 2014 - Petroleum Equity acquired the fields from ATP Oil & Gas UK

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. List Of Oil Production Platforms In The UK
  3. List Of Oil and Gas Production Platforms In The UK
  4. Seaway Heavy Lifting Oil And Gas References
  5. FoundOcean Europe Subsea References
  6. Serimax Pipeline References
  7. ATP Oil & Gas Corporation Increases Tors Ownership
  8. Petroleum Equity in $133 million acquisition of ATP Oil & Gas UK

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License