Galia Oil Field

Related Pages

UK Oil & Gas Fields

EnQuest Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: EnQuest
  • Country: UK
  • Location: North Sea
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • Technip:
    • Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline,
    • Installation of three 8” flexible risers,
    • Installation of two production control umbilicals/risers,
    • Installation of four power cables and associated dynamic risers,
    • Procurement, fabrication and installation of a 175 ton manifold structure,
    • Associated trenching operations, tie-ins, testing and commissioning.
  • Jumbo: FPSO mooring, installation and hook-up contract

History

  • 1983 - Duncan field development approved
  • 2012 - Field development approval given
  • 2012 - Technip awarded subsea contract
  • 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract
  • 2014 - FPSO mooring spread installed

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea
  3. Jumbo main installation contractor for EnQuest Producer
  4. Jumbo installs North Sea FPSO mooring spread

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License