G14, G16 and G17 Gas Fields
Related Pages
Netherlands Oil & Gas Fields
GDF Suez Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: GDF Suez
- Country: Netherlands
- Location:
- Production start: 2002
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- Initially production was from G17-d-A Platform
- The second phase of development consisted of the relocation of two existing platforms and one sub-sea completion, the construction of two new platforms and the laying of 46-km offshore gas pipeline.
- The platforms are; a central production platform, G17d-AP, three satellite platforms, G14-A, G16-A and K2b-A and a subsea completion, G17a-S1
- Gas is transported on the Noordgastransport NGT Gas Pipeline
Contractors
- Saipem: Transport and installation of G17-d-A
- HSM: G17d-AP Topsides
- Seaway Heavy Lifting: Transport & installation of the K2b-A Production Platform
History
- 2002 - First gas from G17-d
- 2005 - G17-d-AP Production Platform installed
- 2006 - Production started
Geology
Links
- Platforms Netherlands Continental Shelf
- Seaway Heavy Lifting Oil And Gas References
- HSM Offshore Platform References
- Saipem Pipeline References
- Gaz de France brings five gas fields on stream in the Netherlands offshore
page revision: 3, last edited: 23 Mar 2015 11:40