Franpipe Gas Pipeline
Summary Information
- Source: Draupner E riser platform, North Sea, Norway
- Destination: Port Ouest, Dunkerque, France
- Ownership: Gassco
- Website: http://www.gassco.no/
- Length: 840 kilometres ( miles)
- Capacity: 53.7 Mscm per day
- Status: Operating
Details
- The Franpipe system runs for 840 kilometres from the Draupner E riser platform in the North Sea to the receiving terminal at Port Ouest in Dunkerque on the French coast.
- It has an internal diameter of 42 inches.
Contractors
- McDermott-ETPM: Pipeline construction
- Saipem: Transport and Installation
History
- 1995 - McDermott-ETPM awarded contract
- 1998 - The Franpipe Gas Pipeline entered operations
- 1999 - The pipeline's name is changed to Franpipe
Other Information
- The original name for the pipeline was NorFra
Links
- Gassco, Franpipe
- Saipem Europe Pipeline References
- Statoil Contract Awarded To J. Ray Mcdermott Joint Venture
- New gas link inaugurated
page revision: 5, last edited: 15 Jul 2015 11:12