Fort Hills Oil Sands Project

Related Pages

Canada Oil & Gas Fields

Suncor Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Suncor
  • Country: Canada
  • Location: Athabasca, Alberta
  • Production start: Expected 2017
  • Partners: Suncor - 40.8%, Total - 39.2%, Teck - 20%
  • Type: Oil / Gas
  • Estimated Reserves: 3.4 billion barrels
  • Production Volume:

Description

  • The field has approximately 3.4 billion barrels of bitumen, which will be recovered through open-pit mining
  • The project is planned to mine and process 110 million tonnes of oil sand per year, yielding an average of 180,000 barrels of bitumen per day at full production
  • capital investment in Fort Hills is estimated at approximately $13.5 billion
  • Oil is to be transported on a new pipeline to Enbridge's mainline hub at Hardisty, Alberta

Contractors

  • WorleyParsons: Detail Engineering phase; Ore Preparation Plant and Extraction and Tailings areas
  • Fluor: Engineering, procurement, fabrication and construction
  • Kentz: Full engineering, design and procurement of the project telecommunication systems
  • Aecon: Mining Contract

History

  • 2002 - The Fort Hills mine received regulatory approval
  • 2007 - Design Basis Announced for Fort Hills Project
  • 2010 - Total acquired 20% of the project
  • 2011 - Total increased its stake
  • 2013 - WorleyParsons awarded detailed engineering
  • 2013 - Final investment decision taken
  • 2014 - Fluor awarded EPC contract

Geology

Links

  1. Design Basis Announced for Fort Hills Project
  2. Total E&P Canada Ltd completes acquisition of UTS Energy Corporation
  3. Suncor Energy finalizes strategic alliance with Total E&P Canada Ltd.
  4. Contract award for detailed engineering work for the Fort Hills Mine in Canada
  5. Suncor Energy and partners proceeding with Fort Hills oil sands project
  6. Enbridge to Develop $1.6 Billion Wood Buffalo Extension Pipeline for Fort Hills and Suncor
  7. Enbridge to Develop $1.4 Billion Norlite Diluent Pipeline
  8. Kentz awarded further scope in Canada for the Fort Hills Oil Sands Project
  9. Aecon awarded mining project for Fort Hills oil sands project
  10. Fluor Secures Canadian Oil Sands Contract

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License