Fateh Oil Field

Summary Information

  • Operator: Dubai Petroleum
  • Country: UAE
  • Location: Dubai
  • Production start: 1969
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:


  • The field has a number of platforms, including O-ZB and N-B
  • A tripod platform, known as T-02, was installed in 2014. The platform consists of a minimal topside and subsea structure and hosts an exploration well during an upcoming drilling and well test campaign.


  • McDermott-ETPM: Fateh to WP7 pipelines
  • Kwsubsea: O-ZB and N-B Subsea Water Injection Replacement Pipeline
  • Global Maritime: Warranty surveyor for installation of pipelines for O-ZB and N-B Project


  • 1966 - Fateh Oil Field discovered
  • 1969 - First oil produced
  • 2014 - T-02 platform was installed



  1. Kwsubsea Detailed Design Subsea References
  2. Foundocean Middle East Subsea References
  3. Global Maritime Pipeline References
  4. Serimax Pipeline References
  5. 2H Offshore Delivers Lightweight Conductor Supported Tripod Platform Design For Dubai Petroleum

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License