Erawan Gas Field
Related Pages
Thailand Oil & Gas Fields
Chevron Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Chevron
- Country: Thailand
- Location: Gulf of Thailand
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The first commercial natural gas field in the Gulf of Thailand, the field utilises an FSO
- There are three production platforms , Erawan BWA, EWG & SWA and a Mercury Removal Platform (ERMRP)
Contractors
- Sofec: External Turret for FSO Erawan
- Bluewater:
- CALRAM Buoy for FSO Erawan
- Calm Buoy system for FSO Erawan
- Micoperi: Installation of subsea pipelines
- Saipem: Riser platform
- Cuel: Mercury Removal Platform (ERMRP)
- FoundOcean: Grouting for platforms
History
- 1981 - Erawan Gas Field began production
Geology
Links
- [http://www.chevron.com/documents/pdf/thailandfactsheet.pdf ]
- Sofec FPSO References
- Micoperi Offshore Pipeline References
- Bluewater Mooring References
- FoundOcean Subsea References
- Saipem Asia Pipeline References
- Cuel Platform References
page revision: 9, last edited: 20 Aug 2015 07:15