Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built


  1. South Umbaraka Concession Oil And Gas Fields
    • Kalabsha Development Project 2010 / 2012
    • Client: Khalda Petreolum Company (KPC)
    • Project Description:
      • The project aims to develop the facilities at Kalabsha and overcome the downstream bottlenecking till the receiving point at El Hamra facilities.
      • 1st Phase: To produce 20,000 BOPD (completed)
      • 2nd Phase: To produce 40,000 BOPD Contract Type
      • EP scope: Lump-sum for Professional services and Cost Plus for Material Supply
      • Scope of Services: Basic and Detailed Engineering, procurement and Material supply
  2. Block 10 East Shabwa Oil And Gas Fields
    • Kharir Development Project 2008 / 2010
    • Client: Total E&P Yemen
    • Project Description
      • The project aims to the installation of crude stabilization unit with capacity of 30,000 Barrel per day. The unit includes oil separator, water bath heater, crude storage and export pumps, as well as, supporting utilities. The Project is situated in Kharir at Hadramout, 600 Kilometer from Sana’a in Yemen
      • Contract Type: EPC LSTK Consortium
      • Scope of Services: Engineering, material supply, construction supervision, project management, commissioning, start-up assistance & consortium leader
  3. Safaniya Oil Field
    • Safaniya Water Disposal System Upgrade 2006 / 2009
    • Client: Saudi Aramco
    • Project Description:
      • The project will expand Safaniya Arabian Heavy Crude and Utilities Plants to maintain the plant's crude oil demand until 2011.
      • New facilities shall be added to overcome the expected increase of Water Content from 17% to 35% in Safaniya Crude oil by 2011; which allows for increasing maximum sustain rates & water wash from 383 to 805 MBOD:
      • 3 Low Pressure Production Trap (LPPT) phase separators – 1053 MBOD separation
      • 3 Formation Water Draw-off pumps – 318 MBOD
      • 6 Corrugated Plate Interceptors CPI’s – Total rating 364 MBOD
      • Formation Water Treatment – Rated by 847 MBOD
      • Additional 230 KV electric feeders, Others: Substation / Control System / Utilities
      • Contract Type: EPC LSTK (Main Contractor)
      • Scope of Services: Engineering, material supply, construction, commissioning & start-up and overall management

Al-Khafji Field Development – Phase 1 2006 / 2010
Client: Al-Khafji Joint Operations (KJO)
Project Description
The field development for Khafji has been developed to maintain the maximum sustainable capacity of 300,000 Barrel Oil per Day and production of 125 Million Standard Cubic Feet Per Day of Associated gases, as well as, 50 Million Standard Cubic Feet Per Day gas lift, by installation of 6 new platforms, 8500 tons total structure weight and modification of 9 existing platforms, in addition to subsea pipelines with a total length of 110 kilometer sizing 24 inches, 28 inches, 36 inches and 42 inches and laying of 59 kilometer subsea cables.
Contract Type EPC LSTK – consortium
Scope of Services
Engineering, material supply, supervision of onshore structure fabrication & offshore laying/installation, overall management, consortium leader and commissioning & start-up

GUPCO Rehabilitation Project 2005 / 2015 (Long-Term Contract)

Client: Gulf of Suez Petroleum Company (GUPCO)
Project Description
The project aims to the Rehabilitation of BP offshore facilities including steel structural platforms, topside facilities and subsea pipelines. The offshore facilities consist of 9 complexes & 69 satellites (with an overall count of 119 platforms and 400 wells) and 1600 km of sub-sea pipelines.
The aim of the overall rehabilitation project was to make sure that the whole system could safely operate for at least additional 25 years maintaining the best possible operating conditions and capacities. A qualitative risk based approach had been followed for the whole 119 platforms in order to evaluate the hazard of structural failure.
Contract Type
Professional services and cost plus for material & subcontractors
Scope of Services
EPCM: basic & detailed engineering, procurement services & construction management

Tanak / Omar Vapor Recovery / Tanak Water Injection 2001 / 2003

Client: Al Furat Petroleum Company
Project Description
2 associated vapor recovery units, capacity 2.7 MMSCFD & 3.5 MMSCFD ; new Water injection unit 900 cubic meter/hour at Tanak area, related pipelines 36 Km 10”, 11 Km 8”, 4 Km 4” and utilities.
Contract Type
Lump-sum turnkey
Scope of Services
Basic / detailed engineering, construction, procurement, material supply, commissioning & startup

SABAN / JARNOF - AZRAK / MALEH 1999 / 2000

Client: Al Furat Petroleum Company
Project Description
Upgrade the maximum production capacity of Saban/Jarnof field to 45,000 b/d and upgrade production capacity of Azraq / Maleh field from 35,000 to 55,000 b/d and installation of a new 8.4 km - 10” pipeline.
Contract Type
EPC, LSTK (Main Contractor)
Scope of Services
Basic / detailed engineering, construction, procurement, material supply, commissioning & start-up

Crude Treatment Plant (RAS BAKR) 1999 / 2001

Client: General Petroleum Company (GPC)
Project Description
Treatment for oil with a capacity of 50,000 B/D, including water separation and desalination units.
Contract Type
Lump-sum professional services, disbursable for
material supply and construction
Scope of Services
Basic / detailed engineering, construction, procurement, material supply, commissioning & startup

  1. Meleiha Oil Field
    • Meleiha Field Development
    • 1997 / 1999
    • Client: Agiba Petroleum Company (AGIBA)
    • Project Description: Upgrade the existing production facilities to accommodate the additional condensate received from El Obayied Field.
    • Contract Type: Lump-sum for professional services, disbursable for material supply and construction
    • Scope of Services: Basic / detailed engineering, construction, procurement, material supply, commissioning & start-up

Ras Qattara (El Faras) South Field Development 1996 / 1997

Client: Agiba Petroleum Company (AGIBA)
Project Description
Production capacity is 10,000 BBL/D. The project includes pipeline, gathering system, flow station, utilities and storage. Pipeline system includes transfer pumps, pipeline 55 Km, 6 inch to tie-in flow station with BAPETCO.
Contract Type
Lump sum for professional services, disbursable for equipment, materials and construction Scope of Services
Basic & detailed engineering, procurement, construction supervision, commissioning, start-up and project management services

Port Fouad Gas Field Development 1994 / 1996

Client: Belayim Petroleum Company (Petrobel)
Project Description
1. Offshore Facilities: Four legs (27m water depth) Unmanned platform for the installation of the wellheads, test and production separators, glycol injection facilities produced water separation, treatment and disposal pig traps.
2. Sealines: 12” mixed phase sealine (44 km) for the transportation of the recombined gas and condensate stream, 3” sealine for glycol supply.
3. Onshore Facilities: slug catcher, LTS unit, condensate stabilization unit, and floating roof tanks to store gasoline, dry gas centrifugal compressor.
4. Transportation to Port Said: 14” pipeline (20 km) for dry gas transportation.
Contract Type
Reimbursable, Lump sum
Scope of Services
Basic engineering review, engineering and procurement assistance for onshore facilities
SUMED Pipeline Throughput Achievement 1992 / 1994

Client: Arab Petroleum Pipelines Co. (SUMED)
Project Description
Crude pipeline throughput achievement from 80 to 117 MM T/Y consisting of three areas as follows:
 Ain Sukhna: Effluent treatment System (1000 M3/H) Expansion
 Dahshour: Two new pumping Stations (three pumps 8000 M3/H each) site facilities
 Sidi Kreir: three pumps 4000 M3/H each
Contract Type
EPCM Contractor: Lump-sum for professional services, disbursable for material supply and construction Scope of Services
Basic & detailed engineering, procurement services, construction supervision, commissioning, & start-Up


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License