EIED Oil And Gas Projects
Related Pages
- Bank Guarantee SBLC Lease/Purchase
- BEST OFFER BG/SBLC FOR LEASE OR SALE
- Important factors to consider for the selection of wire ropes
- Financial servcies
- Kjhkllo
- GENUINE BANK GUARANTEE (BG) AND STANDBY LETTER OF CREDIT (SBLC) FOR BUY/LEASE AT THE BEST RATES AVAILABLE
- Fresh Cut BG/SBLC/ Project Non Recourse Funding
- Financial Instrument Fresh Cut BG/SBLC/ Project Non Recourse Funding
- 代做银行流水账单|代办银行流水账单打印|代做工作流水证明|代办征信证明
- Project Financing
- Siraf Refinery Complex Project
- 8 Refineries of 60,000 BPD
- 2015-2018
- SIRAF Condensate Refineries
- Basic Design (Cooperation with TOYO after 2016.03)
- Condensate Refinery Farzanegan. P. S.E. Z (Asaluyeh) 40,000 BPD 2015-2018 Farzanegan Fars Nikoo Basic Engineering Design
- PDH Kangan – 2017-2018 Oil Industries Engineering Co. (OIEC) Feasibility Study
- 5 Stations T.C. re-Installastions Qazvin/Khoramdare, Parchin, Semnan, Nizar Qom 3 5 Stations Gas Compressor 2016-2018 Iranian Gas Engineering & Development Co. (IGEDC) Management & Site Supervision for Installation of Spare T.C. of five Stations
- South Pars Gas Field Development – Phases 17&18 Assaluyeh 1,000 MMSCFD Natural Gas 2×40,000 BBLS/D Condensate 2006-2016 Pars Oil & Gas Company (POGC)/ OIEC Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services
- Kian Petrochemical 1395 KTPA Aromatic &2236 KTPA Olefin 2016-2017 Kian Petrochemical Company Conceptual Study (Cooperation with Axens)
- North-Northeast Six Gas Compressor Stations 58, 57, 54, 52, 30, 30 MMSCMD 2007 IGEDC MC & SSC
- Heavy Oil Refinery Production and Lights Bitumen 1000000 TN Bitumen 2015 IPMI Feasibility Study
- TGTU of South Pars Gas Field Development– Phases 2 & 3, Assaluyeh 2 ´ 130 Ton/day, Liquid sulphur from acid gas TGTU 95% to 99.7% efficiency 2012 (Hold by Owner) Pars Oil & Gas Company (POGC) EPC
- Tabriz Refinery
- Gasoline Production Plant, Tabriz
- 20,000 BPSD 2007-2013
- Tabriz Oil Refinery Co.
- EPCC, Partnership with SEI (China), Construction with TANAVOB
- Ilam HDPE Plant, Ilam 300,000 t/y, HDPE 2004-2013 Ilam Petrochemical Company EPCC, Partnership with MES (Japan)
- Mahshahr Jetty No.2 – 2008-2010 Mahshahr, Petrochemical Special, Economic Zone, Management MC & SSC
- Hormoz Heavy Oil Refinery
- 300,000, BBL/D
- 2008-2012
- (Hold by Owner) NIOEC EPC (as a member of consortium), Part of Utility & Offsite unites
- Tehran Refinery
- Products Quality Upgrading Plant
- 80,000 BBL/D,
- De-sulfurization
- 2007-2012
- NIOEC
- MC & SSC
- Pars Polystyrene Plant, Assaluyeh 250, 000 t/y, Polystyrene 2005-2008 (Hold by Owner) Pars Petrochemical, Company EPCC, Partnership with Simon Carves (UK)
- Sirri Island, Gas Gathering & NGL Recovery 50 MMSCFD Natural Gas, 6,900 BPD Propane, 3,750 BPD Butane, 3,180 BPD Condensate 2004-2007, (Engineering) IOOC/NIOC Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services
- Bid Boland II Gas Processing & Pipiline 57 MMSCMD 2007-2012 IGEDC MC & SSC
- Day & Sepid Zakhur, Gas Field Development – 2009-2011 ICOFC MC & SSC
- Khuzestan Extra Heavy Crude Oil Refinery 180,000, BPSD 2008-2009 NIOEC Basic Design
- Darquain Oil Field Development-Phase 2 2 ´ 55000, BPSD 2007-2009 PEDEC MC & SSC
- South Pars Gas Field Development Project, Phases 9 & 10, Bandar Assaluyeh 2 ´ 1,000 MMSCFD Natural Gas 2 ´ 40,000 BBLS/D Condensate 2004-2008 Pars Oil & Gas Company (POGC) FES, Field Engineering Services
- South Pars Gas Field Development Project – Phases 9 & 10, Assaluyeh 2 ´ 1,000 MMSCFD Natural Gas 2 ´ 40,000 BBLS/D Condensate 2003-2006 Pars Oil & Gas Company (POGC) Detail Engineering and Procurement Engineering Services, As Engineering Sub-Contractor of OIEC
- Qom-III Gas Compressor Station 90 MMSCMD 2004-2006 NIGC Complete Basic Design, Detail Engineering and Engineering Services of Procurement
- Four Gas Compressor Stations – North West 4 ´ 60 MMSCMD 2006-2007 NIGC SSC, Site Supervision Contractor
- Six Gas Compressor Station 87,87,90,90, 90,160 MMSCMD 2002-2005 NIGC SSC, Site Supervision Contractor
- Consulting Services To “MATN” – 2005-2006 PEDEC, “MATN” Consulting Engineering Services
- Acetic Acid Plant, Mahshahr 150,000 t/y, Acetic Acid 2003-2006 Fanavaran, Petrochemical Company FES (Field Engineering Services)
- 7th Olefin Plant, Mahshahr 1,100,000 t/y, Ethylyne 200000 t/y propylene 2001- 2005 Maroun Petrochemical Company (MPC) SSC, Site Supervision Contractor
- 4th Aromatic, Bandar Assaluyeh 750,000 t/y Paraxylene 2002-2005 Borzuyeh Petrochemical Company (BPC) MC, Partnership with Foster Wheeler
- Petrochemical Storage Facilities Lots of and facilities Storage Tanks 2004-2005 PIDMCO FES, Field Engineering Services
- Six Gas Compressor Stations 87, 87, 90, 90,90, 160 MMSCMD 2002-2004 NIGC Complete Basic Design, Detail Engineering and Engineering Services of Procurement
- Acetic Acid Plant, Bandar Imam 150,000 t/y Acetic Acid 2001-2004 Fanavaran Petrochemical Company Detailed Engineering, Procurement and Technical Assistance Services, 29Partnership with GS
- Petrochemical Storage Facilities, Bandar Imam Lots of and facilities Storage Tanks 2002-2004 PIDMCO Complete Basic Design, Detail Engineering and Procurement Services
- 7th Olefin Plant, Mahshahr 1,100,000 t/y, Ethylene 200,000 t/y, Propylene 2000-2004 Marun Petrochemical Company (MPC) Detailed Engineering, Procurement Partnership with Linde
- NGL 1300 180, MMSCFD, of Feed Gas 4400 BBIS/D,of Feed Condensate 1999- 2003 NPC Detailed Design, Procurement Services, Pre-Comm. & Commissioning Supervision
- NGL 1200 260, MMSCFD, Of Feed Gas 1999- 2003 NPC Detailed Design, Procurement Services, Pre-Comm. & Commissioning Supervision
- Turkmenbashy Refinery
- Gasoline unit MSCC, LPG & Gasoline
- Merox Units 24,000, BPSD Gasoline
- 1999-2000
- NIOEC Detail Design, and Procurement, Services
- 6th Olefin Plant, Mahshahr 520,000 t/y, Ethylene 154,000 t/y, Propylene 1998- 2003 Amirkabir Petrochemical Company (AKPC) Detailed Engineering , Procurement & Field Engineering Services, Partnership with Linde
- Noor Abad Gas Compressor Station 86, MMSCMD 2001-2003 OIEC/NIGC Complete Process Basic Design, and Detail Design
- S3 & S6 Gas Compressor Stations 90MMSCMD, For S3 station, & 62MMSCMD for S6 Sstation 2000-2002 NIGC Basic Design for Civil & Structural Discipline and Complete Detail Engineering
- Norooz Oil Field Master Development Plan Altern.A 90,000 BFPD Altern B 120,000 BFPD 1998-1999 Repsol Exploration Pre- Basic Design, for the total Surface Facilities
- South Pars Gas Field Development Phase 1, Stage 2 – 1997-1998 PEDEC Detailed Design (Terminated At 50% Progress)
- Norooz Oil Field Renovation the Persian Gulf Offshore & Onshore 90,000 BBL/D 1997-1998 NIOC Offshore Extended Basic Design
- Khangiran Gas Treating Plant Phase II, Khangiran Two GTU One SRU & Utility Expansion 1996-1999 NIGC Basic Design Review, Detailed Design, Procurement Services & Technical Support
- NGL-600 – 1996-1998 DICE Supervision of Plant Installation
- Gachsaran Gas Treating and Injection, Gachsaran – 1995-1998 NIOC Basic Design Review, Detailed Design, Procurement Services & Technical Support
- Tehran Refinery
- Waste Water Treatment
- 1995-1998
- Tehran Refinery
- Optimization Study
- Sarkhun II Gas Refinery Gas Sweetening Unit 1000 – 1995-1998 NIGC Basic & Detailed Design Technical Assistance
- Tabriz Petrochemical Complex, Tabriz HVAC Engineering 1995-1998 Tabriz Petrochemical Complex Detailed Design and Procurement Services
- Iran Gas Europe Altern. A LNG Altern. B Pipeline, Iran- Europe A:10 LNG Trains each 2.5 million t/y, B: 35 bncm/ySales Gas 1995-1996 Linde Feasibility Study
- ISO Standards Translation – 1995-1996 Plan & Budget, Organization Translation of 137 ISO Standards in to Farsi
- Norooz Oil Field Living Quarters, the Persian Gulf – 1995-1996 NIOC- offshore Basic Engineering
- Master Development Plan for Kharg, Siri, Lavan Islands, & Bahregan Oil Centre, the Persian Gulf – 1995-1996 NIOC- offshore Engineering
- Foundation of Drilling Rigs, Kharg Island – 1995-1996 NIOC- Offshore Engineering & Tech. Support
- 1.33 Million Barrel Crude Oil Storage Tank, Kharg Island 1.33 Million Barrel Crude Oil 1995-1996 NIOC-Offshore Engineering
- Dorood Oil Field Development in the Persian Gulf – 1995-1996 NIOC- Offshore Engineering & Tech. Support
- Arak Lube Oil Arak – 1995 Bonyad Mostazafan Feasibility Study
- NGL 1200 &1300 Plants, Gachsaran Bibi Hakimeh – 1995 NIOC- Onshore Preliminary Engineering Study
- Pak Arab Refinery
- Pakistan Iran- Pak Refinery
- 1995-1996
- NIOC- PERAK
- Engineering, Preparation of Tender Document
- South Pars Gas Field Development (phase-1) – 1995-1997 PEDEC Conceptual Study & Basic Design
- Tehran Refinery,
- Modernisation of Control Systems
- 1995
- Tehran Refinery NIOC
- Basic Design & Optimization Study
- Furfural Unit, Tehran Pars Oil Refinery, Tehran– 1994 -1996 Pars Oil Company Contribution in Detailed Design (Renovation & Capacity Increase)
- Aromatic Unit, Bandar Imam Petrochemical Company, Bandar Imam – 1994-1998 BPC Site Activities, Supervision, Technical Services, Field Engineering & Engineering support
- Esfahan Pipeline River Crossing Bridges Karoon, Jarahi, Zayandehrood River – 1994-1997 NIOC Design Of Bridges & River Crossing (Basic & Detailed Design)
- Sarkhun Pump Station 12,000, BBL/D 1993-1998 NIGC Basic and Detailed Design Engineering & Technical Assistance
- Ahwaz Pipeline Facilities Pump Station for Mile 40 Ahwaz & Tabriz Pipeline, Pump Station for Tabriz-Sarab-Ardabil Pipeline Technical Service (200,000 BBL/D) 1993-1995 NIOC Basic and Detail Design Engineering & Procurement Services, Basic and Detailed Design Engineering & Procurement Services
- Esfahan Polyacryle Complex, Esfahan Air Pollution Control & Recovery System Optimization of Monomer in Polyacryle Co. 1992-1993 1994-1998 Iran Polyacryle Company Basic and Detailed Engineering.
- Khoramabad Nyl-Iran Tire Production Co. , Khoramabad – 1992-1993 Bank of Industry and Mines of Iran Optimization Study for the Use of Nylon Fibbers in the Tire Industry
- Tehran Planning & Information System Design Management Services 1992-1994 Hormozgan Cement Co. Design and Development of Project Planning and Controlling System
- Pakistan/Iran Pak Refinery – 1992-1993 ABB Lummus Crest (Germany) Feasibility Studies
- Ninth (Condensate) Refinery, Bandar Taheri 70,000 BBL/D, DCS Control, The Refinery Includes DEA Gas Treater 1991-1993 NIOC Complete Basic Design of Condensate Refinery
- Khorasan Petrochemical Complex, Bojnurd, Khorasan – 1990-1991 Khorasan Petrochemical Complex Consultancy Services for the Entire Complex
- Esfahan Petrochemical Complex, Esfahan 7,500 BPD 1990-1991 Esfahan Petrochemical Complex Basic & Detailed Design of Feed Facilities
- Arak Refinery
- Arak
- 21,600 BPD,
- DCS Control
- 1990-1991
- TPL, Italy
- Detailed Design NHT/CCR Platformer Units
- L.A.B Complex, Esfahan 12,000 BPD 1988-1991 Iran Chemical Industries Investment Company Basic & Detailed Engineering of Feed facilities Design
- Iranian Petroleum Standards (IPS) Preparation of Standards in all Related Fields For the Ministry of Petroleum 1988-1996 NIOC 398 Standards With More Than 20,000 Pages in 12 Work Disciplines
- Bandar Abbas Refinery
- Bandar Abbas
- Two Separate Trains, each 116,000 BBL/D Vacuum Unit Capacity 63,000 BBL/D
- 1988-1990
- 1990-1997
- Snamprogetti Italy - Basic & Detailed Design of Vacuum & Atmospheric Distillation Unit
page revision: 5, last edited: 31 Dec 2018 09:40