E18A Gas Fields

Related Pages

Netherlands Oil & Gas Fields

Wintershall Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Wintershall
  • Country: Netherlands
  • Location: E18a Offshore Licence
  • Production start: 2009
  • Partners: Total
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • Heerema Marine Contractors: Satellite Jacket Installation
  • KWsubsea: Pipelines, 1 offshore 10" 13%Cr (5.3km) + 1 offshore 8" CS (16.7km)

History

  • 2008 - Total acquires 8% from Talisman
  • 2009 - E18-A platform installed
  • 2009 - First gas produced
  • 2011 - Talisman acquires a share from Vattenfall

Geology

Links

  1. Platforms Netherlands Continental Shelf
  2. FoundOcean Subsea References
  3. KWsubsea Upheaval Buckling And Out Of Straightness Analysis
  4. Total Acquires Goal Petroleum In The Netherlands
  5. Tullow to enhance Dutch portfolio through acquisition of Nuon E&P

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License