Introduction

  • For many decades DYWIDAG has been in the forefront of the development, design and construction of prestressed concrete protective containers for the storage of liquefied gases. The current safety standards for container systems were to a large extent influenced by DYWIDAG's work. Gases requiring storage range from natural gas (LNG) and ethylene to propane and butane, which are by-products of oil refining.

References

  1. Brunei LNG Terminal
    • Lumut, Brunei Darussalam
    • Client: Brunei LNG Sdn. Bhd.
    • LNG Tanks
    • Award: 1991
    • Technical Data: full containment tank, Design & Build, Capacity: 2 x 65,000 m³
  2. Incheon LNG Terminal
    • Inchon, South Korea
    • Client: Korea Gas Corporation
    • LNG Tanks
    • Award: 1993
    • Technical Data: Full containment tanks, deep pile foundation and pile cap, tanks standing on seismic isolators, Design & Engineering & Prestressing
    • Capacity: 10 x 100,000 m³
  3. Al Ruwais Refinery
    • Ruwais, Abu Dhabi, United Arab Emirates
    • Client: Abu Dhabi National Oil Company
    • LPG Tanks
    • Award: 1995
    • Technical Data: Full containment tank, 1 propane tank and 1 butane tank, Design & Build
    • Capacity: 2 x 43,000 m³
  4. Qalhat LNG Terminal
    • Qalhat, Sultanate of Oman
    • Client: Oman LNG LLC.
    • LNG Tanks
    • Award: 1997
    • Technical Data: Full containment tank, Design & Build, Capacity: 2 x 120,000 m³
  5. Tongyoung LNG Terminal
    • Tongyeong, South Korea
    • Client: Korea Gas Corporation
    • LNG Tanks, Design & Engineering & Prestressing
      • Tank 3: 2000
      • Tank 4 -10: 2002
      • Tank 11+12: 2006
      • Tank 13+14: 2007
      • Tank 15+16: 2008
    • Technical Data: full containment tank
    • Capacity: Tank 3 - 14: 14 x 140,000 m³, Tank 15+16: 2 x 200,000 m³
  6. Atlantic LNG Terminal
    • Point Fortin, Trinidad and Tobago
    • Client: Atlantic LNG Company
    • LNG Tank 4
    • Technical Data: full containment tank piled foundation Design & Build
    • Capacity: 160,000 m³
    • Award: 2002
  7. Gwangyang LNG Terminal
    • Gwangyang, South Korea
    • Client: Posco Steel Company
    • LNG Tanks
    • Technical Data: Full containment tank, Design & Engineering & Prestressing
    • Capacity: 2 x 100,000 m³
    • Award: 2003
  8. Long Beach LNG Terminal
    • Long Beach, California, USA
    • Client: (SES) California LNG Project Corp.
    • LNG Terminal
    • Technical Data: Planning contract for FERC application (1st stage of permit procedure) for a receiving terminal
    • Award: 2003
  9. Yemen LNG Terminal
    • Bal Haf, Yemen
    • Client: Yemen LNG Company Ltd
    • LNG Tanks
    • Technical Data: Full containment tank, Design & Engineering & Prestressing, technical advisor on site,
    • Capacity: 2 x 140,000 m³
    • Award: 2005
  10. Brunnsviksholme LNG Terminal
    • Nynäshamn, Sweden
    • Client: AGA Linde Gas
    • LNG Tank
    • Award: 2008
    • Technical Data: Full containment tank, Design & Engineering
    • Capacity: 20,000 m³
  11. Sagunto LNG Terminal
    • Sagunto, Spain
    • Client: SAGGAS
    • LNG Tanks
    • Technical Data: Full containment tank, Design & Engineering & Prestressing
    • Award:
      • Tank 1+2: 2003
      • Tank 3: 2006
      • Tank 4: 2009 (incl. option for Tank 5)
      • Capacity: 4 x 150,000 m³
  12. Pyeongtaek LNG Terminal
    • Pyeongtaek, South Korea
    • Client: Korea Gas Corporation
    • LNG Tanks
    • Award:
      • Tank 11-14: 2004
      • Tank 19+20: 2008
      • Tank 23: 2009
    • Technical Data: Full containment tank, Prestressing
    • Capacity:
      • Tank 11-14: 140,000 m³
      • Tank 19, 20, 23: 200,000 m³
  13. LNG Tank Stuttgart, Germany
    • Client: Technische Werke Stadt Stuttgart
    • Award: 1968
    • Technical Data: full containment tank peakshaving tank
    • Capacity: 30,000 m³
  14. Nitrogen Tank Nuernberg, Germany
    • Client: Linde AG
    • Award: 1971
    • Technical Data: single containment prestressed concrete tank sealed by stainless steel sheets; insulation on the outer surface, designed and constructed for -196oC
    • Capacity: 1,600 m³
  15. LNG Tank Mossel Bay, South Africa
    • Client: Mossgas
    • Award: 1990
    • Technical Data: full containment tank with a liner system consisting of vapour barrier and PU foam on floor and wall
    • Capacity: 10,000 m³