Dunkerque LNG Terminal

Related Pages

LNG Terminals in France

Total LNG Terminals

LNG News

Summary Information

Brief Description

  • Dunkirk's intended LNG terminal would have an annual hosting capacity of 9 Gm3 (billions of m3), or around 20% of France's current consumption.

Technical Details

  • Storage capacity: Three LNG storage tanks each with a capacity of 190,000 m3; a tank measures around 50 m in height and has a diameter of 90 m ;
  • Unloading capacity:
  • Send out capacity: 1.9 million m3(n)/h (cubic meters per hour)
  • Constructor:
    • SOFREGAZ: engineering and project Management contract
    • SENER and Techint have been awarded an EPC contract as the TS LNG consortium
  • Licensor:

Project Status

  • a final investment decision which, given the time needed to prepare the applications, is likely to occur at some point in the first six months of 2010 with start-up expected in 2014.

Customers

  • Total will utilise some of the capacity for its needs
  • EDF will use majority of the capacity to supply 3 new gas fired plants which it is building

History

  • 2008 - Dunkerque LNG awarded SOFREGAZ an engineering and project Management contract
  • 2011 - EDF confirms its investment in Dunkirk methane terminal project
  • 2011 - SENER and Techint were awarded an EPC contract
  • 2011 - Final investment decision made

Other Information

  • -

Relevant Links