Downeast LNG Terminal
Summary Information
- Ownership: Downeast LNG
- Website: http://www.downeastlng.com/
- Location: Passamaquoddy Bay, Maine, USA
- Capacity: million tons/annum
- Status: Planned
Brief Description
- The proposed facility will consist of two storage tanks, a re-gasification plant and a pier to receive LNG carriers.
Technical Details
- Storage capacity: two 160,000 m3 full containment type tanks
- Unloading capacity: LNG vessels with cargo capacities no greater than 165,000 m3.
- Send out capacity: the terminal would have an average total output of 500 MMcfd
- Constructor:
Ongoing Projects/Project Status
- Final EIS recieved (2014)
Suppliers / Customers
- Suppliers:
- Customers:
- The sendout pipeline would extend from the LNG terminal to the existing M&NE pipeline system at the Baileyville Compressor Station
- The M&NE pipeline system serves Maine, New Hampshire, and Massachusetts
History
- 2005 - LNG Terminal Proposed
- 2006 - Application filed with FERC
- 2009 - Draft EIS published by FERC
- 2014 - FERC publishes final EIS
Other Information
- -
Relevant Links
- Draft EIS for the Downeast LNG Project
- DESCRIPTION OF THE PROPOSED ACTION
- CH·IV INTERNATIONAL CONTRIBUTES TO DOWNEAST LNG’S FEDERAL PERMIT APPLICATIONS
- FERC issues Final Environmental Impact Statement on the Downeast LNG Project
page revision: 6, last edited: 19 May 2014 08:23