Doba Oil Field

Related Pages

Chad Oil & Gas Fields

Exxon Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Exxon
  • Country: Chad
  • Location:
  • Production start: 2003
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The complex includes the Bolobo, Miandoum and Kome fields, which began production in 2003; the Nya Field, which achieved first oil in 2005; and the Moundouli Field, which began production in 2006.
  • The Maikeri Field began production in 2007 and the Timbre Field in 2009.

The oil is exported via the Chad Cameroon Oil Pipeline

Contractors

  • -

History

  • 2000 - Chevron takes a 25% stake in the project
  • 2003 - Bolobo, Miandoum and Kome fields come on stream
  • 2014 - Chevron sold its stake to the Chad state

Geology

Links

  1. Chevron Joins Chad Development Consortium
  2. Chad-Cameroon Oil Project Celebrates Official Project Inauguration
  3. Chevron Announces Sale of Interests in Chad and Cameroon

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License