Costa Azul LNG Terminal
rating: 0+x

Related Pages

Mexico LNG Terminals

Sempra LNG Terminals

LNG News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/lng\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More LNG News

LNG Blog Entries

Summary Information

Technical Details

  • Storage capacity: Two full-containment storage tanks (2 x 160,000 cubic meters)
  • Unloading capacity:
  • Send out capacity: 1 bcf/d
  • Constructor:
    • Techint SA de CV of Mexico
    • Black & Veatch of Kansas City, Mo.
    • Mitsubishi Heavy Industries of Tokyo
    • Vinci Construction Grands Projects of France
    • Freyssinet: LNG Tank post-tensioning

History

  • 2004 - Sempra LNG announced the signing of a 20-year sales-and-purchase agreement with BP and its Tangguh LNG partners for 500 million cubic feet of natural gas a day.
  • 2005 - Sempra LNG announced the award of engineering, construction and procurement contracts for Energía Costa Azul.
  • 2005 - Sempra LNG was awarded a 15-year natural gas supply contract by Mexico's state-owned electrical utility, Comisíon Federal de Electricidad (CFE).
  • 2008 - the Al Safliya, a 210,000 cubic meter ship, brought the first LNG cargo from Qatar used to successfully cool down the terminal.

Ongoing Projects/Project Status

Suppliers / Customers

Other Information

  • -

Relevant Links

  1. Freyssinet LNG Tank References
  2. Energía Costa Azul LNG Terminal
  3. Engineering, Procurement and Construction Contract For Mexico LNG Receipt Terminal

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License