Clipper Oil And Gas Field

Related Pages

USA Oil & Gas Fields

ATP Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: ATP
  • Country: USA
  • Location: Green Canyon Blocks 299 & 300, Gulf of Mexico
  • Production start: 2013
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • This field is located in Green Canyon Block 299, at a water depth of 1,055 meters (3,460 feet) and is tied back to the Front Runner Oil Field.

Contractors

  • Technip:
    • design and manufacture of two high pressure flexible risers, approximately 2.4 kilometers long each (1.5 mile),
    • engineering for the installation and welding of one pipe-in-pipe oil production flowline and one gas line, each approximately 25 kilometers long (15.5 miles),
    • installation of the flowlines, risers, and umbilical,
    • fabrication and installation of four subsea structures and associated jumpers, flying leads, and
    • pre-commissioning.

History

  • 2005 - Clipper Oil And Gas Field discovered
  • 2009 - Technip awarded SURF contract
  • 2012 - Successful Clipper Well Test completed
  • 2013 - First production

Geology

Links

  1. Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
  2. Technip awarded two contracts by Bluewater Industries in the Gulf of Mexico
  3. ATP Marks Successful Clipper Well Test

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License