Claxton Platform References
Related Pages
Engineering News
Engineering Blog Entries
- Morsa West
- Client: Sonangol
- Location: Angola
- Water depth: 17m
- Wells: 5
- Weights topside: 55te
- This was the first CoSMOS™ platform – installed by jack-up drilling rig and tied back to a MOPU. The platform is ABS certified to class A1 Offshore Hydrocarbon Producing Station.
- Olowi Oil Field
- A tall subsea template that was installed on a central conductor by a jack-up drilling rig. The four support conductors were pre-drilled and cemented. The topside was then installed by a crane barge.
- Client: CNR
- Location: Gabon
- Water depth: 38m
- Wells: 9 with gas lift and future water injection capability
- Weights: topside structure 315te, subsea structure 168te.
- Okoro Setu Oil Field
- Afren
- Location- Nigeria
- Water depth- 12m
- Wells- 9 with gas lift and future water injection capability
- Weights- topside 150te (included 25te manifold), subsea template 25te
- Installed by a jack-up rig. Claxton’s involvement included full EPCI execution of the subsea template and topside.
- Songkla Development
- NuCoastal
- Location- Thailand
- Water depth: 24m
- 16 Wells
- 2500te total (including topsides, subsea structures and piles)
- This platform offers something truly unique – it provides twin bridge-linked platforms; one with 16 wells and the second providing process facilities. There was also a 1000te tender assist drilling unit placed on the well structure.
- Idd El Shargi North Dome Field
- Installed by jack-up rig, this single deck wellhead platform was for a range of water depths.
- There were multiple installations for expansion of the existing field infrastructure, with integrated manifolds to export direct to adjacent process platform.
- Client: Oxy Qatar
- Location: Arabian Gulf
- Water depth: 24-36m
- Wells: 5 single wells with expansion capacity for splitter wells or 4 additional freestanding conductors
- Weights: topsides up to 228te, templates up to 100te
- Dissoni North Oil Field
- This platform was designed for installation from either a barge or a jack-up rig. A triple deck platform, it incorporates a full range of process, instrumentation and facilities.
- Client: Perenco
- Location: Cameroon
- Water depth: 7m
- Wells: 9 well with gas lift and water injection capability
- Weights: topside 230te