CJSC PMP Refinery Project References
rating: 0+x

Related Pages

Engineering News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/engineering\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

Engineering Blog Entries


Most Recently Updated Pages



Prelude Floating LNG Terminal

14737949310_3b4bde1eee_m.jpg

Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built


Electric Desalter – Atmospheric Distillation Units (- Atmospheric and Vacuum Distillation Units)
Electric Desalter (ЭЛОУ) , Atmospheric and Vacuum Distillation Units (АВТ), and Bitumen-Production Units within Paraffin Solvent Production Unit (UPRP) JSC "LUKOIL-Kogalymneftegaz" Detailed Design 1994-1996 Commissioned in 1997
Kogalym
Revamping of the Atmospheric Distillation Column of Atmospheric and Vacuum Distillation Unit,  RPE "PETON" Detailed Design 1996 Commissioned in 1996
JSC "BITRAN", Ukhta Orsk
Revamping of Crude Oil Stabilization Unit (USN -1500) CJSC "Stabilizatsia" Business Plan 1997
Nizhnevartovsk
Revamping of Oil Stabilization Unit (USN 4-1) to increase its Feed Capacity to 2.0 million tpy  Volgograd Company "Neftezavodmontazh" Detailed Design 1998 Commissioned in 1999
LLC "Nizhnevartovsk RPE", Tyumen Oil Company Volgograd

  1. Astrakhan Gas Processing Plant
    • JSC "Delta"
    • Revamping of the Atmospheric Distillation Unit in Astrakhan Gas Processing Plant
    • Technical and Economic Assessment
    • 1998

Revamping of 2.0 million tpy Oil Stabilization Unit  Volgograd Company "Neftezavodmontazh" Detailed Design 1999 Commissioned in 2000
(USN 4-2) (ЭЛОУ-АТ) LLC "Nizhnevartovsk RPE", Tyumen Oil Company Volgograd
Upgrading of Column Equipment with replacement of internals Orenburg Gas Processing Plant OJSC "Orenburggazprom" Technical Design 1999 Commissioned in 1999
Revamping of Gas Condensate Stabilization Unit  State-run enterprise "Turkmengaz" Technical and Commercial Proposal 1999
(GS-2) Turkmenia
Revamping of Atmospheric and Vacuum Distillation Unit OJSC "LUKOIL-Odessa Refinery" Technical and Commercial Proposal 2000
Odessa, Ukraine
Additional equipment of AT-1 Unit to increase its capacity to 3.2 million tpy OJSC "LUKOIL-Ukhtaneftepererabotka" OJSC "LUKOIL-Rostovneftekhimproekt" Detailed Design 2000 Commissioned in 2001
Rostov-on-Don
Revamping of Electric Desalter, Atmospheric and Vacuum Distillation Unit to increase its capacity to  OJSC "LUKOIL-Rostovneftekhimproekt" Process Part of Detailed Design 2000-2001 Commissioned in 2001
2.1 million tpy OJSC "LUKOIL-Odessa Refinery" Rostov-on-Don
Yuzhno-Shapkinskoye Field Crude Oil Treatment Unit Petrofac LLC Detailed Design Documentation 2002 Commissioned in 2004
Great Britain
Technical support in operation of Kogalym Refinery. Obtaining of Process Operating Regulations Approval for Paraffin Solvent Production Unit (ЭЛОУ-АВТ) CJSC "Kogalymneftegas" Technical Assistance 2003
Major turnaround of ЭЛОУ АВТ-2 Unit with capacity  OJSC "Khersonnefte-pererabotka" Detailed Design 2004 Commissioned in 2004
2.2 million tons/year Kherson, Ukraine
Upgrading of ЭЛОУ-АВТ-6 Unit under Koh-Glitsch Basic Design at the Refinery OJSC "Angarsk Petrochemical Company" OJSC "Angarskneftechim-proekt" Detailed Design Documentation 2006-2007
Angarsk
Turn-key construction project of Crude Stabilization Unit USN-500 (500 000 tpy capacity) at oil and gas transshipment complex CJSC “Syntez-Oil” Technical Annexes to the Contract 2007
Revamping of shop No.3 column section and installation of reboilers LLC "Nizhnevartovsk RPC" Detailed Design 2007-2008 FAU "RF Glavexpertiza" positive conclusion
Nizhnevartovsk
Major turnaround and revamping of fuel oil Vacuum Distillation Unit No.1 (VT-1) at Turkmenbashi Refinery with increase in capacity up to 1.6 million tpy LLC "Elitstroy" Detailed Design 2007
Elaboration of BEDD for Electric Desalter for preparation of Russian oil refining and chemical engineering corrosion prevention system for cooler-condenser equipment of Atmospheric Distillation Columns of ELOU-AVT Unit with capacity 500 000 tpy, town of Volkhov LLC "Volkhovneftechim" Elaboration of BEDD 2007-2008

  1. Khabarovsk Refinery
    • OJSC "Khabarovsk Oil Refinery"
    • Revamping of vacuum section of electric desalter АВТ (ЭЛОУ-АВТ) unit at OJSC "Khabarovsk Oil Refinery"
    • Detailed Design Documentation
    • 2012

Revamping of heat exchange circuit of ЭЛОУ-АВТ-2.5 unit at OJSC "Novoshakhtinsk Petroleum Product Plant" OJSC "Novoshakhtinsk Petroleum Product Plant" Detailed Design Documentation 2012
Revamping of electric desalter АВТ (ЭЛОУ-АВТ) unit at OJSC "Khabarovsk Oil Refinery" OJSC "Khabarovsk Oil Refinery" Detailed Design Documentation 2013-2014
Hydrotreating Units
Revamping of the Л-24-8 Unit for R&D Center of Oil Company "LUKOIL" Feasibility Study 1996
LLC "LUKOIL- Volgogradneftepererabotka" Moscow
1.0 million tpy Diesel Oil Hydrotreating Unit LLC "LUKOIL-Volgograd- Technical and Commercial Report 1996
neftepererabotka"
Volgograd
Upgrading of ЛЧ-24-2000, ЛГ-24-7, Л-24-6 Units JSC "KINEF" Technical and Commercial Proposal 1996
Kirishi, Leningrad Region
1.4 million tpy Diesel Hydrotreating Unit JSC "LUKOIL-Rostovneftekhimproekt" Detailed Design 1997-1998 Commissioned in 2000
(P -24-1400/1) for LLC "LUKOIL-Volgogradneftepererabotka" Rostov-on-Don Licensor - UOP
Upgrading of Stabilization Section in JSC "Moscow Refinery" Technical and Commercial Proposal 1997
ЛЧ -24-2000 Unit Moscow
Addition of Gas/Air Catalyst Regeneration Section to Л-24-6 Unit OJSC "Cracking" Detailed Design 1998 Commissioned in 1998

  1. Saratov Refinery
    • Saratov, OC "Sidanko"
    • Upgrading of Hydrogen Concentration Section of ЛЧ-24-2000 Diesel Oil Hydrotreating Unit
    • OJSC "Moscow Refinery"
    • Detailed Design Documentation
    • 1999
    • Commissioned in 2000
  2. Saratov Refinery
    • Saratov, OC "Sidanko"
    • Upgrading of Л-24-6 Unit OJSC "Saratov Refinery"
    • Justification of Investments
    • 2001

Revamping of Л-24-5 Hydrotreating Unit with replacement of reactors and heaters OJSC "Moscow Refinery" Detailed Design Documentation 2001-2002 Revamped in 2002
Moscow

  1. Saratov Refinery
    • Saratov, OC "Sidanko"
    • Increase in Hydrotreatment Capacity of Saratov Refinery to 2,000,000 tpy (3 versions)
    • Technical and Commercial Proposal
    • 2002

Hydroprocessing Complex for OC "Alliance" Specifications for Design Development for LG&EC, South Korea 2004
OJSC "Khabarovsk Refinery"
Revamping of KGO Unit. Kerosene Cut Hydrotreating Section at OJSC "LUKOIL-Odessa Refinery" JSC "LUKOIL-Rostovneftekhimproekt" Detailed Design Documentation 2006-2007 Revamped in 2009
Rostov-on-Don
Constructiion of Wax Hydtrotreating Section of 40/3 Deoiling Unit at OJSC "LUKOIL-Nizhegorodnefteorgsyntez" OJSC "LUKOIL-Nizhegorod- Detailed Design 2007-2009 FAU "RF Glavgosexpertiza" positive conclusion. Commissioned in 2010. Licensor –
nefteorgsyntez" LLC "Katachim", Moscow
Nizhniy Novgorod
Hydrotreating Reactor of Unit ЛЧ-24-2000 at OJSC "LUKOIL-Nizhegorod- Technical Design 2007
OJSC "Nizhegorodnefteorgsyntez" nefteorgsyntez"
Nizhniy Novgorod
Revamping of Unit ЛЧ-24-2000 aiming to change to production of diesel oil with sulfur content 10 ррm at OJSC "LUKOIL - Nizhegorodnefteorgsyntez" OJSC "LUKOIL-Nizhegorod- Design Documentation Detailed Design Documentation 2008-2010 FAU "RF Glavgosexpertiza" positive conclusion.
nefteorgsyntez" Commissioned in 2010.
Nizhniy Novgorod Licensor – UOP
Diesel-oil Hydrotreating Unit at LLC "Afipsky Refinery" LLC "Afipsky Refinery" Follow-up of Basic Design Acceptance 2012 Licensor – Haldor Topsoe
Combined Diesel Oil Hydrotreatment Unit and Hydrogen Production Unit PGV-2000 at LLC "Afipsk Refinery" Design Documentation 2013
LLC "Afipsk Refinery"
Revamping of Hydrotreatment Section at Catalytic Reforming Unit at OJSC "Khabarovsk Oil Refinery" OJSC "Khabarovsk Oil Refinery" Design Documentation Detailed Design Documentation 2014
Hydrotreating and Hydrodewaxing Units
850,000 tpy Diesel Oil Hydrodewaxing Unit (GDS-850) of OJSC "LUKOIL-Ukhtaneftepererabotka" OJSC "LUKOIL-Rostovneftekhimproekt" Detailed Design 2001
Rostov-on-Don
Elaboration of detailed design documentation on revamping of reactor section of unit GDS-850 aiming to produce diesel oil with sulfur content 10 ppm and capacity increase to 1.1 million tpy at OJSC "LUKOIL-Ukhtaneftepererabotka" OJSC "LUKOIL- Nizhegorodniinefteproekt" Nizhniy Novgorod Detailed Design 2011-2012
Hydroisodewaxing unit of hydrocracked residue with production of group II and III base oils at LLC “Gazpromneft-SM” – “Omsk lubes production plant” LLC “Gazpromneft-SM” - “OZSM” Follow-up and Acceptance of Basic Design 2014

  1. Syzran Refinery
    • OJSC "Syzran Refinery" Syzran, OC YUKOS
    • Light Hydrocracking Units
    • Upgrading of Л-24/8С Unit for vacuum gas oil light hydrocracking process
    • Technical and Commercial Proposal
    • 1999
  2. Kuibyshev Oil Refinery
    • OJSC "Kuibyshev Refinery" Samara, OC YUKOS
    • Upgrading of Л-24/6 Unit for light vacuum gas oil hydrocracking process
    • Technical and Commercial Proposal
    • 1999
  3. Syzran Refinery
    • OJSC "Syzran Refinery"
    • Upgrading of Syzran Refinery Л-24/8С Unit
    • Volgogard Company "Neftezavodmontazh"
    • Detailed Design
    • 2000-2001 Commissioned in 2001 Licensor – Criterion
  4. Syzran Refinery
    • OJSC "Syzran Refinery"
    • for the light vacuum gas oil hydrocracking process
    • Volgograd
  5. Syzran Refinery
    • OJSC "Syzran Refinery"
    • Upgrading of Л-24/8С Unit at OJSC "Syzran Refinery" with increasing capacity to 850 000 t/y
    • OJSC "Syzran Refinery" Syzran, OC Rosneft
    • Detailed Design Documentation
    • 2010-2011 Commissioned in 2011 Licensor – Criterion

Catalytic Reforming Units with NHT sections
1,000,000 tpy Gasoline Cut Mixture Catalytic Reforming Unit Turkmenbashi Refinery Technical and Commercial Proposal 1996
Turkmenbashi, Turkmenia
Revamping of Л-35-11/300 Unit to increase its capacity to 450,000 tons/year OJSC "Moscow Refinery" Technical and Commercial Proposal 1996
Moscow
Addition of Pre-contactor and Revamping of Heater Section at Л-35-11/300 Unit Tuapse Refinery Check Calculations and Detailed Design Documentation 1996 Revamped in 1998
Tuapse, OC Rosneft
Revamping of Reactor and Heater section of Л-35-11/300 Unit OJSC "Moscow Refinery" Detailed Design Documentation 1996 Commissioned in 1997
Moscow Licensor – UOP
Replacement of Л-35-11/300 NHT Reactor OJSC "Moscow Refinery" Detailed Design Documentation 1996 Mounted in 1997
Moscow
Revamping of ЛЧ-35-11/1000 Catalytic Reforming Unit for Seidinsk Refinery (Chardzhou) GRIMMA Company Technical and Commercial Proposal 1997
FRG
Revamping of Л-35-11/300 Unit to increase its capacity to 400,000 tpy Tuapse Refinery Technical and Commercial Proposal 1997
Tuapse, OC Rosneft
Gas Recovery Section of Reforming Unit with capacity of 20,000 tpy TPP "LUKOIL-Uraineftegaz" Detailed Design 1997 Commissioned in 1998
Urai
Regeneration Gas Treatment Section in Tuapse Refinery Detailed Design Documentation 1998 Сommissioned in 1998
Л -35-11/300 Unit Tuapse, OC Rosneft
Replacement of Reactor Effluent Separator of NHT Section in Л-35- 11/300 Unit LLC "KINEF" Technical and Commercial Proposal 1998
Kirishi, Leningrad Region
Replacement of Separator in Л-35-11/300 Unit LLC "KINEF" Detailed Design 1999 Mounted in 1999
Kirishi, Leningrad Region
Upgrading of ЛЧ-35-11/600 Unit LLC "KINEF" Technical and Commercial Proposal 1999
Kirishi, Leningrad Region
500,000 tpy Catalytic Reforming Unit with NHT Section OJSC "Komsomolsk Refinery" Justification of Investments 1999
Komsomolsk-on-Amur,
OC Rosneft
Control system upgrading of ЛЧ–35-11/1000 Unit LLC "KINEF" Technical and Commercial Proposal 1999
Kirishi, Leningrad Region
Revamping of Л-35-8/З00B Aromatic Hydrocarbons Unit for LLC "LUKOIL-Volgogradneftepererabotka" UOP Feasibility Study 1999
Great Britain
Revamping of CR-1 Catalytic Reforming Unit, AD "LUKOIL-Neftochim", Bourgas, Bulgaria OJSC "LUKOIL-Rostovneftekhimproekt" Process Part of Business Plan 2000
Rostov-on-Don
Revamping of Л-35-8/300-B Unit to increase benzene yield LLC "LUKOIL-Permnefteorgsyntez" Feasibility Study 2000
Perm
1,000,000 tpy Catalytic Reforming Unit with Afterfractionating Section (PR- 22-35-11/1000) for "LUKOIL-Volgogradneftepererabotka" OJSC "LUKOIL-Rostovneftekhimproekt" Detailed Design 2000-2006 Commissioned in 2006
Rostov-on-Don Licensor– UOP

  1. Saratov Refinery
    • Saratov, OC "Sidanko"
    • Upgrading of Л-35-11/300 Unit OJSC "Saratov Refinery"
    • Justification of Investments
    • 2001

Revamping of ЛГ-35-11/300 Catalytic Reforming Unit OJSC "LUKOIL-Odessa Refinery" Process Calculations and Assignment for supply of PACKINOX Heat-Exchanger 2001
Odessa, Ukraine
Revamping of ЛГ-35-11/300 Catalytic Reforming Unit at OJSC "LUKOIL-Ukhtaneftepererabotka" UOP Feasibility Study 2001
Great Britain
Upgrading of ЛГ-35-11/300 Catalytic Reforming Unit to increase its capacity to 380,000 tpy at OJSC "LUKOIL-Ukhtaneftepererabotka" OJSC "LUKOIL-Rostovneftekhimproekt" Detailed Design 2002-2004 Commissioned in 2004
Rostov-on-Don Licensor – UOP

  1. Syzran Refinery
    • OJSC "Syzran Refinery"
    • Hydrotreating Sections of Catalytic Reforming Units
    • Recommendations regarding equipment protection against corrosion and salt formation
    • 2002
    • Syzran, OC Rosneft

Hydrogen-Rich Gas Drying Section and Hydrotreating and Reforming Catalyst Regeneration Section of VR-650 Unit LLC "LUKOIL-Western Siberia" Detailed Design Documentation 2002 Mounted in 2003
Uraineftegaz Refinery

  1. Syzran Refinery
    • OJSC "Syzran Refinery"
    • Protection of Catalytic Reforming Equipment against Organic Chloride Corrosion
    • Design
    • 2002 Mounted in 2003
    • Syzran, OC Rosneft

Revamping of Л-35-8/300Б Unit to increase its capacity to 400,000 tpy LLC "LUKOIL-Volgogradneftepererabotka" Detailed Design 2002 Commissioned in 2003
Volgograd Licensor – UOP
Upgrading of Unit ЛГ-35-11/600. Calculation of sulfur trap pipe system OJSC "Khersonnefte-pererabotka" Calculations and detailed design documentation 2002 Commissioned in 2003
Kherson, Ukraine Licensor – VNIINeftechim,
St. Petersburg
Installation of feed heat- exchanger of PAKINOX type in Reforming Section of ЛГ-35-11/300-95 Unit OJSC "LUKOIL-Odessa Refinery" Detailed Design Documentation 2003 Installation completed in February 2004
Odessa, Ukraine
Upgrading of Unit Л-35-11/600. Recommendations on operation of heaters P-201 and P-202 for capacity Qmin =250 000 tons/year and Qmax=350 000 tons/year OJSC "Kherson-neftepererabotka" Recommendations 2003
Kherson, Ukraine
Upgrading of Unit Л-35-11/600. Recommendations on operation of Unit Л-35-11/600 at pressure 18 kgf/cm2 (gage) in the last reactor of Catalytic Reforming section for capacity Qmin =250 000 tons/year and Qmax=350 000 tons/year OJSC "Kherson-neftepererabotka" Recommendations 2003
Kherson, Ukraine
Upgrading of Unit ЛГ-35-11/300-95 to increase capacity to 450,000 tons/year (based on feed flow rate) OJSC "Khabarovsk Refinery" Basic Design (using Criterion catalyst) 2003 Licensor – Criterion
OC Alliance
Automated process control system of Units ЛГ-35-UVPB for LUKOIL-Odessa Refinery OJSC "LUKOIL-Odessa Refinery" Detailed Design 2004-2005 Mounted in 2005
Odessa, Ukraine
Upgrading of section 200 "Catalytic Reforming" of Unit ЛK-6U and construction of "Recontact" Section LLC "PetroKazakhstan Oil Products" Detailed Design Documentation 2004 Detailed Design Documentation on the 1st stage was handed over to the Refinery. Financing was suspended
Shymkent, Republic of Kazakhstan Licensor – UOP
Installation and piping of the reciprocating compressor for Unit ЛГ-35-11/300 at OJSC "LUKOIL-Odessa Refinery" Detailed Design Documentation 2007
OJSC "LUKOIL-Odessa Refinery" Odessa, Ukraine

  1. Syzran Refinery
    • OJSC "Syzran Refinery"
    • Revamping of Unit ЛЧ-35/11-600 aiming to reduce pressure and construction of benzene cut separation unit
    • Detailed Design
    • 2007-2009 FAU "RF Glavexpertiza" positive conclusion.
    • Syzran, OC Rosneft
    • Commissioned in 2011.
    • Licensor – Axens

Revamping of Catalytic Reformer Unit ЛГ-35-11/300 to increase capacity from 300000 to 450 000 t/y at OJSC "Khabarovsk Refinery" OJSC "Khabarovsk Refinery" Detailed Design Documentation 2007-2010 1st phase – uniy was brought to capacity 350 000 t/y in 3rd quarter 2010
OC Alliance Licensor – Criterion
748 000 t/y catalytic reforming unit with continuous catalyst regeneration OJSC "NPK-Galychina" Design Documentation Detailed Design Documentation 2008 Part of the documentation was developed. Finance suspended
Ukraine
Piping of CRU plate heat exchanger in refinery complex ЛК-6У in LLC "PetroKazakhstan Oil Products" LLC "PetroKazakhstan Oil Products" Detailed Design Documentation 2010 Mounted in February 2011
Shymkent, Republic of Kazakhstan

  1. Kuibyshev Oil Refinery, Samara
    • OJSC "Samaraneftekhimproect"
    • Revamping of Unit Л-35/11-1000 at Kuibyshev Refinery aimed to operate at reduced pressure in reformer section
    • Design Documentation Detailed Design Documentation
    • 2010

Revamping of heater section of unit ЛГ-35-11/300-95 at LLC "LUKOIL-Ukhtaneftepererabotka" LLC "LUKOIL-Nizhegorodniinefteproject" Detailed Design Documentation 2012 Commissioned in 2012
Nizhniy Novgorod
Revamping of Hydrotreatment Section at Catalytic Reforming Unit at OJSC "Khabarovsk Oil Refinery" OJSC "Khabarovsk Oil Refinery" Design Documentation Detailed Design Documentation 2014
Gas Treatment Units
Unit for Removing Hydrogen Sulfide from Off-Gases of the VNIINP-714 Additive Production Unit at Yaroslavl Refinery named after Mendeleev JSC "Oils and Additives Producers" Detailed Design 1993-1994 Construction suspended in 1995 due to lack of finance
Moscow
Upgrading of Synthesis Gas Potash Treatment Unit JSC "Akron" Technical and Commercial Proposal, and Detailed Design 1996-1997 Completed in 1998
Novgorod
Isomerization Units
Provision of Services for Ordering Equipment for PI-200 Isomerization Unit and Work Coordination on Use of Existing Parex-2M Unit Equipment in PI-200 Unit JSC "Permnefteorgsyntez" Procurement 1993-1994
Perm
JSC "Lengiproneftekhim"
St. Petersburg
PI-200 Unit. Hydrotreating Reactor JSC "LUKOIL-Permnefteorgsyntez" Detailed Design 1994
Perm
PI-200 Unit. Stack. Unit Heaters. Process part of the Process Operating Regulations for Hydrotreating Section Design JSC "LUKOIL-Permnefteorgsyntez" Detailed Design 1996
Perm
Addition of 213,000 tpy Isomerization Unit to Л-35-11/300 Unit OJSC "Moscow Refinery" Detailed Design 2000-2001
JSC "Korimos"
Moscow
Addition of 170,000 tpy С5/С6 Isomerization Unit to Catalytic Reforming Unit Petrotel-LUKOIL Refinery Detailed Design 2000-2001 Commissioned in 2001
Romania Licensor – UOP
Isomerization and Oligomerization Units "LINOS" Company Feasibility Study 2002
120,000 tons/year Isomerization Unit PI-DIH/120 OJSC "LUKOIL-Odessa Refinery" Detailed Design 2003 Commissioned in August 2004
Odessa, Ukraine Licensor – UOP
50,000 tpy n-butane Isomerization Unit AD "LUKOIL Neftochim Bourgas" Detailed Design Documentation 2004-2007 Commissioned in 2008
Bulgaria Licensor – Axens
IBP-85°С Cut Isomerization Unit with Feed-preparation and Deisopentanization sections of capacity 80.000 tons/year OJSC "Khersonnefte-pererabotka" Detailed Design 2004 Approvals package was. submitted for approval in 2006. Finance suspended.
Kherson, Ukraine

  1. Syzran Refinery
    • OJSC "Syzran Refinery"
    • Isomerization Unit with DHT, Hydrogenation and Deisogexanation PGI-DIH/280
    • Detailed Design
    • 2006-2009
    • FAU "RF Glavexpertiza" positive conclusion.
    • Syzran, OC Rosneft
    • Commissioned in 2011
    • Licensor – Axens
  2. Kuibyshev Oil Refinery
    • OJSC "Samara
    • Licensor – Axens
    • Isomerization Unit with NHT, Hydrogenation and Deisohexanization sections PGI-DIH/280-K at Kuibyshev Refinery
    • Design and Detailed Design Documentation FAU "RF Glavexpertiza" positive conclusion.
    • 2009

С5-С6 Cut Isomerization Unit at OJSC "Samara- Technical assistance during Basic Design Acceptance 2009 Licensor – Axens
OJSC “Novokuibysevsk Refinery” neftekhimproekt"
Samara
Low-temperature Isomerization Complex with NHT, Hydrogenation and Deisohexanization sections PGI-DIH/280-NK at OJSC "Samara- Design and Detailed Design Documentation 2010 FAU "RF Glavexpertiza" positive conclusion.
OJSC "Novokuibyshevsk Refinery" neftekhimproect" Under construction.
Samara Licensor – Axens

  1. Salavat Refinery
    • OJSC "Gaspromneftechim Salavat
    • Licensor – Axens
    • Pentane-Hexane Cut Isomerasation Unit ПГИ-434 at OJSC "Salavatneftechim
    • Design and Detailed Design Documentation
    • 2012-2014
    • FAU "RF Glavexpertisa" favourable conclusion

Isoselectoforming Units
Conversion of Л-35-5 Unit for Isoselectoforming Process JSC "Ufaneftekhim" Technical and Commercial Proposal 1997
Ufa, Bashkiria

  1. Kuibyshev Oil Refinery
    • Conversion of Л-35-11/300 Unit (OJSC "Kuibyshev Refinery") to Isoselectoforming Process NPP "Petrotech"
    • Check Calculations of Equipment and Detailed Design Documentation
    • 1999
    • Converted in 1999

Sulfur Recovery Units
Engineering services for construction of H2S Recovery Unit at OJSC "Khabarovsk Oil Refinery" Tecnimont KT Italy Detailed Design Documentation 2011-2012 Under construction
Hydrogen Recovery Unit
Hydrogen Recovery Unit at LCC "Afipsky Refinery" LLC "Afipsky Refinery" Follow-up of Basic Design Acceptance 2012 Licensor – Haldor Topsoe
Marketable Oils Production Units
10,000 to 15,000 tpy Marketable Oil Production Section CJSC "Dalneft" Basic Design 1993
Komsomolsk-on-Amur
10,000 to 15,000 tpy Marketable Oil Production Section JSC "LUKOIL-Service" Standard Design 1993
Moscow
Marketable Oil Production Section JSC "Atyrau Refinery" Technical Proposal 1997
Atyrau
Combined Units
Combined 70-360°С Wide Distillate Cut Hydrotreating and Catalytic Reforming Unit JSC "LUKOIL-Kogalymneftegaz" Basic Design 1993-1994
Kogalym
Combined Catalytic Reforming and Isomerization Unit for North Africa region "Grimma" Company Technical and Commercial Proposal 1999
Germany
Combined 70-360°С Long distillate Hydrotreating Unit and Catalytic Reforming JSC "LUKOIL-Western Siberia" Refinery within "Kogalymneftegaz"  Company, Kogalym Detailed Design Documentation 2002-2004 Commissioned in March 2005
Combined 70-360°С Long Distillate Hydrotreating and Catalytic Reforming Unit JSC "LUKOIL-Western Siberia" Refinery within "Kogalymneftegaz" Company, Kogalym Process Operating Regulations 2004
Reconstruction of C-100 at КТ-1/1 Complex OJSC "Gazpromneft- Justification of Investments 2012
Omsk Refinery"
Combined Unit G-43-107 at OJSC “Gazpromneft - Moscow Refinery” OJSC “Gazpromneft - Moscow Refinery” Follow-up and Acceptance of Basic Design 2014
Catalyst Production
Reforming Platinum Catalysts Production OJSC "OLCAT" Process Part of Detailed Design 1994
St. Petersburg
Oil Refining. Refineries
ZMТ-250 Motor Fuel Refinery JSC "Lukoil-Kogalymneftegaz" Construction Feasibility Study 1994-1995
Kogalym
ZMТ -200 Motor Fuel Refinery ЧМЗ Production Corp. Construction Feasibility Study 1996
Glazov, Udmurtia
1,500,000 tpy Refinery JSC "LUKOIL-Arktik-Tanker" Construction Feasibility Study 1997
Murmansk
ZMТ-500 Motor Fuel Refinery in Kopeisk OJSC "Oil-Service" Construction Feasibility Study 1997
Chelyabinsk
500,000 tpy Motor Fuel Plant in Bolshoy Kamen CJSC "Far East Oil Company" Construction Feasibility Study Report 1997
Upgrading of Samotlor Refinery Tyumen Oil Company Check Calculations of Equipment for Upgrading Project 1999
LLC "Nizhevartovsk Research and Production Corp."
Nizhevartovsk
Upgrading of fuel production part at "Petrotel-LUKOIL" Refinery LUKOIL-Romania Business Plan 1999
Bucharest, Romania
Upgrading of Ukhta Refinery JSC "LUKOIL-Rostovneftekhimproekt" Development of Business Plan Process Part 2000
Rostov-on-Don
Construction of 3 million tpy Primorsky Refinery, Leningrad Region OJSC "Mariisky Machine-Building Plant" Preparation of Declaration of Intent for construction investment 2001

  1. Astrakhan Gas Processing Plant
    • Astrakhan, OJSC "Gasprom"
    • Rebuilding of Astrakhan gas processing plant in terms of design development of control system connection Astrakhan gas processing plant
    • Detailed Design Documentation
    • 2003
    • Commissioned in 2004

Motor fuel refinery,.construction stage II LLC "LUKOIL-West Siberia" Updating of Feasibility Study 2003
Refinery within
LLC "Kogalymneftegaz"
Kogalym
Elaboration of proposals on development of crude oil refinery (1.8 mln and 2.5 mln tons/year of crude oil) OJSC "Khersonnefte-pererabotka" Proposals 2003
OC Alliance, Ukraine
Declaration of Intent on investment in construction of oil refinery in Vyborg area of Leningrad Region CJSC "VNP" Declaration of Intent 2003
Vyborg
Declaration of Intent on Investment in Construction of Advanced Processing Complex at OJSC "Khabarovsk Refinery" OJSC "Alliance Group" Declaration of Intent 2004
Feasibility Study (studiya "Proekt") for Construction of Hydroprocessing Complex at OJSC "Khabarovsk Refinery" OJSC "Alliance Group" Feasibility Study (studiya “PROEKT”) 2004-2005
Declaration of Intent on Construction of 1,000,000 tons/year Oil and Gas Complex at Usinsk Region of Komi Republic LLC "Usinsk Refinery" Declaration of Intent 2006
Usinsk
BEDD preparation for design of 2 million tpy Ulan-Bator Refinery "Vostokneftegas" Company Feasibility Study 2006
Pre-engineering study, collection and preparation of basic data for construction of Tyumen Refinery with 3 million tpy capacity LL "Tekhneftinvest" Pre-engineering study 2007
Tyumen
Pre-design preparation for construction of gas-condensate processing plant with capacity 600,000 tpy in Tikhvin LLC "AVRO" Pre-engineering study 2007-2008
Phased transfer of Khabarovsk Refinery consumers to natural gas use OJSC "Khabarovsk Refinery" Technical and economic estimation 2007
OC Alliance
Pre-engineering study and elaboration of technical and economic estimation for 2.5 million tpy refinery in Volkhov LLC "Volkhovneftekhim" Pre-engineering Study Technical and Economic Estimation 2007
Volkhov
Updating of Feasibility Study (studiya "PROEKT") to split Hydroprocessing Complex construction in the process of revamping OJSC "“Khabarovsk Refinery" into OJSC "Khabarovsk Refinery" Feasibility Study (studiya “PROEKT”) 2008-2009
4 phases OC Alliance
Execution of General Designer functions at Chudovo Refinery LLC "AVRO" 2008-2009
Reconstruction of LLC "Ilskiy Refinery" LLC "Ilskiy Refinery" Technical and Economic Calculation 2012
Off-Site Facilities
Off-Site Facilities of ZMT-250 Motor Fuel Refinery JSC "LUKOIL-Kogalymneftegaz" Detailed Design Documentation 1995 Commissioned in 1997
Kogalym
Unit for Treating Drip Oil and Oil Sludge Turkmenbashi Refinery Technical and Commercial Proposal 1996
Turkmenbashi, Turkmenia
Recycling Water Supply Unit Turkmenbashi Refinery Technical and Commercial Proposal 1997
Turkmenbashi, Turkmenia
Oil Products Metering Unit LLC "LUKOIL-Uraineftegaz" Detailed Design Documentation 1997-1998 Commissioned in 1998
Urai
Feedstock Supply Unit at the Catalytic Reforming Unit LLC "LUKOIL-Uraineftegaz" Detailed Design Documentation 1997-1998 Commissioned in 1998
Urai
Light Oil Products Loading Rack JSC "Korimos" Detailed Design 1998 Commissioned in 1999
Moscow
Gas Distributing Point. Upgrading Stabilizatsia Company Detailed Design 1998 Commissioned in 1999
Nizhevartovsk

  1. Saratov Refinery
    • Saratov, OC "Sidanko"
    • Flare System. Upgrading OJSC "Cracking"
    • Technical and Commercial Proposal
    • 1999

Chemical Laboratory. Upgrading Volgograd Company "Neftezavodmontazh" Detailed Design 1999 Commissioned in 2000
LLC "Nizhevartovsk NPO"
Nizhevartovsk, TNK-BP
Feedstock and Saleable Product Tank Farms with Pump Stations for pumping feedstock and oil products of USN 4-2 Unit Volgograd Company "Neftezavodmontazh" Detailed Design 1999 Commissioned in 2001
LLC "Nizhevartovsk NPO"
Nizhevartovsk, TNK-BP
Hydrogen-Rich Gas Concentration Unit. Booster Compressor Station OJSC "LUKOIL-Permnefteorgsyntez" Detailed Design 2000-2001 Commissioned in 2002
Perm
Nitrogen and Oxygen Generation Station and Diesel Fuel PPD Addition Section (USN 4-2) LLC "Nizhevartovsk Oil Refining Corp." Detailed Design 2002
Off-site facilities of ZMT-250 Motor Fuel Refinery (storage facilities, additive injection section and air compressor station) JSC "LUKOIL-West Siberia" Detailed Design Documentation 2003-2004 Commissioned in March 2005
Oil Refinery within LLC "Kogalymneftegaz"
Kogalym
Upgrading of Heating Center No. 1, workshop No.14 for LLC "Kirishinefteorgsyntez" LLC "Proekt-Technology" Detailed Design Documentation 2004 Commissioned in 2006
St. Petersburg

  1. Syzran Refinery
    • OJSC "Syzran Refinery"
    • Construction of Central laboratory
    • Feasibility Study (studiya “PROEKT”) Detailed Design Documentation
    • 2006 Commissioned in 2007
    • Syzran
  2. Syzran Refinery
    • OJSC "Syzran Refinery"
    • MTBE Production Complex
    • Amenity building with distribution substation
    • Design Documentation Detailed Design Documentation
    • 2011-2014
    • FAU “RF Glavgosexpertisa” favourable conclusion 
    • Syzran
    • Licensor - Axens
  3. Syzran Refinery
    • OJSC "Syzran Refinery"
    • MTBE Production Complex
    • Methanol storage and MTBE storage
    • Design Documentation Detailed Design Documentation
    • 2011-2014
    • FAU “RF Glavgosexpertisa” favourable conclusion 
    • Syzran
    • Licensor - Axens
  4. Syzran Refinery
    • OJSC "Syzran Refinery"
    • MTBE Production Complex
    • Intermediate butane-butylene cut tank farm. Intermediate MTBE tank farm
    • Design Documentation Detailed Design Documentation
    • 2011-2014
    • FAU “RF Glavgosexpertisa” favourable conclusion 
    • Syzran
    • Licensor - Axens
  5. Syzran Refinery
    • OJSC "Syzran Refinery"
    • MTBE Production Complex
    • Interconnecting piping lines
    • Design Documentation Detailed Design Documentation
    • 2011-2014
    • FAU “RF Glavgosexpertisa” favourable conclusion 
    • Syzran
    • Licensor - Axens
  6. Salavat Refinery
    • OJSC “Salavatneftekhimremstroy”
    • Licensor - Axens
    • Control room building with transformer substation, intermediate tank farm and interconnecting piping lines for connection of Pentane-Hexane Cut Isomerization Unit PGI-434 at OJSC “Gazprom neftekhim Salavat”
    • Design Documentation Detailed Design Documentation
    • 2012-2014
    • FAU “RF Glavgosexpertisa” favourable conclusion
    • Under construction 
  7. Salavat Refinery
    • OJSC “Salavatneftekhimremstroy”
    • Licensor - Axens
    • Firefighting pump house with fire tanks as part of Pentane-Hexane Cut Isomerization Unit PGI-434
    • Design Documentation Detailed Design Documentation
    • 2012-2014
    • FAU “RF Glavgosexpertisa” favourable conclusion
    • Under construction 

Complex of Diesel Oil Hydrotreatment Units at  LLC "Afipsk Refinery" Design Documentation 2013
LLC "Afipsk Refinery". Off-site facilities
Petrochemistry
Revamping of LI-150V Unit for MTBE production with capacity of 200,000 tpy JSC "Korimos" Detailed Design 1994 Commissioned in 1995 Licensor – OJSC "Yarsyntes", Yaroslavl
Moscow
Section for Removing Methanol from Butane-Butylene Cut in MTBE production Unit JSC "Korimos" Detailed Design 1995 Commissioned in 1995
Moscow
Re-planning to Compressor House, Transformer Substation and Control Room at the MTBE Unit JSC "Korimos" Detailed Design 1995 Commissioned in 1996
Moscow
Propylene Complex Novokuibyshevsk Petrochemical Plant Technical and Commercial Proposal 1996
Samara Region, Novokuibyshevsk
80,000 tpy Oligomerization Unit JSC "Korimos" Detailed Design 1996 Commissioned in 1997 Licensor – OC "VNIIOS", Novokuibyshevsk
Moscow
Conversion of Propylene Hydroformylation Section producing butyl alcohol and 2-ethyl hexanol to process using rhodium catalyst OJSC "Interchimprom-Oxosyntez" Technical and Commercial Proposal 1997
Perm
Addition of Equipment to MTBE Unit under General Explosion Safety Rules (PB 09-170-97) JSC "Korimos" Detailed Design 1998 Completed in 1999
Moscow
Revamping of EP-60 Unit for MTBE production (Salavat, Bashkiria) JSC "Korimos" Detailed Design 1998
Moscow
TAME Production Section. Additition of equipment to Oligomerization Unit within MTBE Unit JSC "Korimos" Detailed Design 1999 Commissioned in 1999 Licensor – OJSC "Yarsyntez", Yaroslavl
Moscow
200,000 tpy TAME Unit JSC"Korimos" Detailed Design 2000-2001 Commissioned in 2002 Licensor – OJSC "Yarsyntez", Yaroslavl
Moscow
Feed-preparation Section for 200 000 tpy TAME Unit JSC "Korimos" Detailed Design Documentation 2002 Commissioned in 2003 Licensor – OJSC "Yarsyntez", Yaroslavl
Moscow
Combined Fuel Refining Unit KTD-200/720. Section 100 - TAME unit with Feed-Preparation section JSC "Korimos" Process Operating Regulations 2003
Moscow
Addition of equipment to Reactor Section 100 of Combined Fuel Refining Unit KTD 200/720 JSC "Korimos" Detailed Design 2007
Moscow
Major Repair of Combined MTBE and Oligomerizate Unit at JSC "Korimos" LLC "Stroyinvest" Detailed Design Documentation 2007
Moscow
Major Repair of Section 100 "TAME Production" of Combined Fuel Refining Unit KTD 200/720 JSC "Korimos" Detailed Design Documentation 2008-2009
Moscow

  1. Kuibyshev Oil Refinery
    • OJSC "Samara
    • Licensor – OJSC "Yarsyntez", Yaroslavl neftekhimproekt"
    • MTBE Unit at OJSC "Kuibyshev Refinery"
    • Design and Detailed Design Documentation
    • 2010-2012
  2. Syzran Refinery
    • OJSC "Syzran Refinery"
    • MTBE Unit
    • Basic Design Acceptance
    • 2010-2011
    • Licensor – Axens

neftekhimproekt"
Samara

  1. Syzran Refinery
    • OJSC "Syzran Refinery"
    • MTBE Production Complex
    • OJSC "Syzran Refinery"
    • Detailed Design Documentation
    • 2011-2014
    • FAU "RF Glavexpertisa" favourable conclusion
    • OC Rosneft
    • Licensor – Axens

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License