Cidade De Sao Paulo MV23 FPSO

Related Pages

Brazil FPSOs

Modec FPSOs

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

Brief Description

  • Oil processing capacity 120,000 barrels of oil per day
  • Gas processing capacity 180 million cubic feet per day
  • Oil storage capacity approximately 1,600,000 barrels
  • Water injection capabilities 150,000 barrels per day
  • Mooring Type Spread Mooring (in 2,140 meters)
  • The production wells are connected to the vessel through the pioneering platform connecting system known as BSR (Buoyancy Supported Risers)

Contractors

  • MODEC: Engineering, procurement, construction, mobilization, and operation of the FPSO, including topsides processing equipment as well as hull and marine systems.
  • BrasFELS: Fabrication of riser manifolds, laydown areas and the flare tower as well as the assembly and integration on board the FPSO
  • VWS Westgarth: Water Treatment
  • Bomesc: Pancake Modules, Chemical Injection Module, Gas Turbine Generator Module and SRU Module

Status

  • In operation

History

  • 2011 - MODEC, Mitsui & Mitsubishi awarded contract
  • 2013 - First oil produced

Other Information

  • -

Links

  1. VWS Westgarth FPSO References
  2. Bomesc Offshore Engineering Topsides Modules References
  3. Participation in FPSO chartering for Guara Field in Petrobras' pre-salt area
  4. Keppel’s yard in Brazil receives US$2 million in bonuses for safe and early delivery of an FPSO
  5. First production from Sapinhoá field, offshore Brazil
  6. Nine platforms that will boost oil production in Brazil

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License