Cidade De Caraguatatuba FPSO

Related Pages

Brazil FPSOs

Modec FPSOs

Upstream News

For More Upstream News

Summary Information

Brief Description

  • The vessel will be capable of processing 100,000 barrels of crude oil per day, 177 MMSCFD, 120,000 barrels of water injection per day and has storage of 1,600,000 barrels of crude oil


  • Schahin Group / MODEC: Engineering, procurement, construction, mobilization, installation and operation of the FPSO, including topsides processing equipment as well as hull and marine systems.
  • SOFEC: Design and supply of the spread mooring system.
  • Toyo Engineering: Turnkey contract for engineering, procurement of equipment and materials, and manufacturing and installation of topsides modules
  • GE: Gas turbine generators to supply 85 megawatts (MW)


  • Under construction
  • The FPSO delivery is expected by June 2016


  • 2013 - Schahin Group / MODEC awarded FPSO contract

Other Information

  • -


  1. MODEC and Schahin Group awarded Carioca FPSO charter contract from Petrobras and partners of Consortium BM-S-9
  2. TOYO Awarded FPSO Topsides Units Projects for Brazil
  3. GE Expands Distributed Power Presence in Brazil’s Offshore Sector

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License