Cidade De Angra Dos Reis MV22 FPSO

Related Pages

Brazil FPSOs

Modec FPSOs

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Name: Cidade De Angra Dos Reis MV22 FPSO
  • Field: Lula Oil Field
  • Country: Brazil
  • Ownership: Modec
  • Website: http://www.modec.com/
  • Operated By: Petrobras
  • Capacity: 100,000 barrels of oil per day or 150,000 barrels of total fluids per day, 150 million cubic feet per day of gas
  • Year of Completion

Brief Description

  • MODEC converted the VLCC "M/V Sunrise IV" into the FPSO Cidade de Angra dos Reis MV22.
  • The FPSO is capable of processing 100,000 barrels of oil per day or 150,000 barrels of total fluids per day, 150 million cubic feet per day of gas, and having a storage capacity of approximately 1,600,000 barrels.
  • The FPSO is also able to inject 100,000 barrels of water per day.
  • The facility is designed for H2S and CO2 removal and is capable of reinjecting CO2 downhole at 550 bar in addition to exporting sales gas to shore.

Contractors

  • Modec: Engineering, procurement, construction, mobilization and operations for a pilot FPSO, including topsides processing equipment, hull and marine system
  • Sofec: Spread Mooring
  • Aker Solutions: Seawater treatment system: inlet filters, media filters, deaerator, feed pumps, cartridge filters, membrane trains, cleaning package, control panel
  • BOMESC: Seawater Treatment Module - EPIC

Status

  • In operation

History

  • 2008 - Modec awarded FPSO contract
  • 2010 - Vessel arrives on site
  • 2011 - First oil produced

Other Information

  • -

Links

  1. Sofec FPSO References
  2. Aker Solutions Increased Oil Recovery (IOR) References
  3. BOMESC Offshore Engineering Topsides Modules References
  4. MODEC lands Tupi Pilot FPSO for Petrobras
  5. MODEC Announces Monumental Achievement for the FPSO Cidade de Angra dos Reis MV22
  6. First well in Lula field confirms high production potential

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License