Cartagena Lng Terminal
Related Pages
LNG Terminals in Spain
Enagas LNG Terminals
LNG News
For More LNG News
LNG Blog Entries
Summary Information
- Ownership: Enagas
- Website: http://www.enagas.es/
- Location: Escombreras Dock, Cartagena, Spain
- Capacity: million tons/annum
- Status: In Operation
Brief Description
- -
Technical Details
- Storage capacity: 55,000 m3 + 105,000 m3 + 127,000 m3 + 150,000 m3
- Unloading capacity:
- Send out capacity:
- Constructor:
- CB&I, Design of phase 1
- Foster Wheeler: detailed engineering, equipment and material procurement, and construction supervision for expansion
- Licensor:
Ongoing Projects/Project Status
- A fifth tank of 150,000 m3 capacity is being added to the terminal
Suppliers / Customers
- Suppliers:
- Customers:
History
- 1989 - The terminal entered into operation with 55,000 m3 in storage capacity
- 1997 - It was linked up to the basic gas pipeline network
- 2000 - A new container berth was opened for methane container vessels of up to 130,000 m3
- 2002 - The second tank came into operation (105,000 m3)
- 2002 - Foster Wheeler awarded detailed engineering, equipment and material procurement, and construction supervision for expansion
- 2005 - The third (127,000 m3) entered into service
- 2008 - The fourth (150,000 m3) tank entered into operation
Other Information
- -
Relevant Links
- Terminal Webpage
- Foster Wheeler Iberia Wins Two LNG Terminal Expansion Projects in Spain
- Foster Wheeler Awarded Contract by Enagas for Spanish LNG Terminal Project
- CB&I LNG References
page revision: 8, last edited: 08 Dec 2012 17:47