Cameron Lng Terminal
Summary Information
- Ownership: Sempra
- Website: http://www.sempralng.com/
- Location: On the Calcasieu Channel, 18 miles from the Gulf of Mexico in Hackberry, Louisiana
- Capacity: 1.5 million tons/annum
- Status: In Operation
Technical Details
- Storage capacity: Three full-containment storage tanks (3 x 160,000 cubic meters)
- Unloading capacity:
- Send out capacity: 1.5 billion cubic feet per day of initial send out capacity
- Constructor: Aker Kvaerner / IHI
- Licensor:
Ongoing Projects/Project Status
- The terminal design also included the future expansion capability to increase total terminal capacity to 2.65 BSCFD and one additional 160,000 cubic meter LNG storage tank
- The terminal is to be converted into a liquifaction terminal
- See Cameron Lng Export Terminal Project
Suppliers / Customers
- Suppliers: Trinidad
- Customers: Sempra LNG signed a 20-year Capacity Agreement with ENI S.p.A. for a TSA for 40% of the capacity of the Cameron LNG receipt terminal
History
- 2005 - Construction began
- 2009 - Commercial operations
Other Information
- -
Relevant Links
- Cameron LNG Brochure
- Aker Solutions, Cameron LNG for Sempra Energy
- Aker Solutions/IHI Partnership achieves substantial completion for Cameron LNG Terminal, USA
page revision: 10, last edited: 28 Apr 2012 07:22