Summary Information
- Ownership:
- Website: http://www.calhounlng.com/
- Location: Port Lavaca – Point Comfort, Texas
- Capacity: 7.2 million tons/annum
- Status: Cancelled
Brief Description
- A large scale LNG regasification terminal
Technical Details
- Storage capacity: 2 x 160,000 m³
- Unloading capacity: Marine docking facilities with single berth capable of mooring and unloading LNG carriers in the class 75,000 m³ to 220,000 m³
- Send out capacity: 1.0 billion cubic feet (Bcf) per day
- Constructor:
- TGE Gas Engineering: Front End and Engineering Design Services (FEED)
Ongoing Projects/Project Status
- The project has been Cancelled
Suppliers / Customers
- Suppliers:
- Customers:
- The proposed Point Comfort Pipeline originating at the terminal will include 27 miles of 36-inch pipeline, and will connect with nine major pipelines including 5 interstate and 4 intrastate pipeline systems serving Texas and the Midwest, Northeast, and Southeast regions of the country.
History
- 2005 - Tractabel awarded FEED
- 2006 - FERC prepared the draft Environmental Impact Statement (EIS)
- 2007 - Kogas signed an MOU to become a partner
- 2007 - FERC awards permission for the project
- 2012 - FERC revokes permission for the project
Other Information
- -
Relevant Links
- Tractebel Engineering LNG References
- 2 x 160,000 m³ LNG Receiving Terminal, Calhoun - USA
- KOGAS, LG International, and EMS Group join forces with Gulf Coast LNG Partners, LP in the Calhoun LNG Project
- Notice of Availability of the Draft Environmental Impact Statement
- Order Vacating Section 3 Authorization and Certificate Authorization for Calhoun LNG